![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984041.webp)
Procedure
1. Drill and thread the holes in the floor
at the positions (A).
2. Make rectangular holes on the
positions (B) and (C). For dimension
specifications, refer to section
.
3. Make sure that the AC power cable
and other cables come out of the floor
at the marked area (B).
4. Make sure that the DC power cables
come out of the floor in the marked
area (C).
A
B
C
Foundations
6AGA000007-0611-EN | 001
41
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......