![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 83](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984083.webp)
Procedure
1. Install the covers on the terminals (A).
2. Install the plate (B).
3. Install and tighten the fasteners (C).
18.7
Remove the DC busbar cover
Preliminary requirements
•
Screwdriver, cross
Procedure
1. Remove the fasteners (A).
2. Remove the cover (B).
18.8
Install the DC busbar cover
Preliminary requirements
•
Screwdriver, cross
•
Four fasteners M5
A
B
C
A
B
A
Access to parts
6AGA000007-0611-EN | 001
83
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......