![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 49](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984049.webp)
10
Mechanical installation of the power supply
box
10.1
Install the power supply box - general procedure
Preliminary requirements
1.
The site is prepared
Procedure
1. Prepare the wall. Refer to section
2. Install the brackets on the power supply box. Refer to section
3. Install the power supply box on the wall. Refer to section
10.2
Prepare the wall for the power supply box
Preliminary requirements
•
Spirit level
•
Drill with bit size
recommended by the
manufacturer of the wall-
plugs
•
Four wall-plugs, 12 mm, for
anchor screws M8x80
Procedure
1. Mark the location for the holes (A) on
the wall. Use the spirit level and make
sure the holes are at the same height.
For dimension specifications, refer to
section
.
2. Drill the mounting holes.
3. Insert the plugs (B) into the mounting
holes.
10.3
Install the brackets on the power supply box
Preliminary requirements
•
Torque wrench
•
Four mounting brackets
•
Four bolts M5 with washers
A
A
B
Mechanical installation of the power supply box
6AGA000007-0603-EN | 001
47
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......