15
Electrical installation of the control box
15.1
Electrical installation of the control box - general
procedure
Preliminary requirements
1.
The control box is
installed on the wall
•
Procedure
1. Open the door of the control box. Refer to section
2. Insert the cables to the control box through the cable glands. Refer to section
.
3. Connect these cables:
a. PE cables to the control box. Refer to section
b. Auxiliary DC power cables to the control box. Refer to section
c. Ethernet cables to the control box. Refer to section
d. Interlock and DC guard cables to the control box. Refer to section
e. Power supply feedback cable to the control box. Refer to section
f. DC power cables to the control box CR. Refer to section
g. DC power cables to the control box CCS. Refer to section
15.9
h.
Connect the cable reel interlock cable CR
15.10
i. Connect the CCS control cable from the cable reel CR
15.11
4. Close the door of the control box. Refer to section
18.10
.
15.2
Insert the cables to the control box
Preliminary requirements
•
Torque wrench
•
Electrical installation of the control box
6AGA000007-0611-EN | 001
63
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......