![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 64](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984064.webp)
•
PE cables. Refer to section
•
DC auxiliary power cable.
•
Power supply feedback
cable. Refer to section
.
•
Interlock cable (first control
box). Refer to section
•
DC guard cable. Refer to
section
•
Control pilot cable. Refer to
section
•
DC power cables (if there is
a next control box in the
daisy-chain: three pairs, if
there are no more control
boxes in the daisy-chain:
two pairs). Refer to section
.
Procedure
1. Loosen the nuts (A) of the cable
glands.
2. Insert the cables (B) through the
glands. For the overview of glands,
refer to section
3. Slide the nuts of the cable glands over
the cables.
4. Tighten the nuts to the correct torque.
For the specifciation, refer to section
15.3
Connect the PE cables in the control box
Preliminary requirements
•
Torque wrench
•
Wire cutter
•
Wire stripper pliers
•
Crimp pliers
•
•
PE cables. Refer to section
•
Wire end rings M10
•
Bolt M10
B
A
Electrical installation of the control box
64
6AGA000007-0611-EN | 001
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......