![ABB HVC-C 100-150 kW Скачать руководство пользователя страница 82](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984082.webp)
Procedure
1. Install the front border cover (A):
a. Align the cover bolts with the holes
in the bottom part of the cabinet.
b. Install the nuts and wahers (C).
c. Tighten the nuts.
2. Install the rear cover (B):
a. Install the cover.
b. Install the bolts (D).
c. Tighten the bolts.
18.5
Remove the plate and the covers
Preliminary requirements
•
Screwdriver, cross
Procedure
1. Remove the fasteners (A).
2. Remove the plate (B).
3. Remove the covers from the terminals
(C).
18.6
Install the plate and the covers
Preliminary requirements
•
Screwdriver, croess
•
Three fasteners M5
B D
A
C
C
B
A
Access to parts
82
6AGA000007-0611-EN | 001
Содержание HVC-C 100-150 kW
Страница 1: ...Installation manual HVC C 100 150 kW Overnight Copyright ABB All rights reserved CCS and CR variant ...
Страница 42: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 42 6AGA000007 0611 EN 001 ...
Страница 79: ...P a g e l e f t i n t e n t i o n a l l y b l a n k 6AGA000007 0611 EN 001 79 ...
Страница 106: ......