5-19
c.
The adjustment of the steel wire rope has reached the limit adjustment range and cannot be adjusted
further.
d.
The pulley fails to pass the wear gauge inspection.
e.
Six wires break in one wire rope, or three wires break in one wire rope, or one valley breaks, or one
break occurs at the wire rope joint.
5.2.8.5 Wire rope fastening
a.
Adjust the boom to the horizontal fully retracted attitude, and adjust the initial extension lengths A
and B of the boom as required. The allowable error of A and B is ± 5mm/0.197in.
Figure 5-19 Initial extension of boom
b.
Clamp the rope head to prevent the rope from rotating.
Do not pinch the threads when tightening, otherwise the threads may be damaged. When tightening,
clamp the end of the wire rope near the thread to prevent the wire rope from rotating, otherwise it
will cause damage to the wire rope.
Figure 5-20 Clamping the rope
A(185)
B(495)
Summary of Contents for ZT20J
Page 8: ......
Page 9: ......
Page 17: ......
Page 18: ......
Page 25: ......
Page 26: ......
Page 43: ......
Page 44: ......
Page 58: ......
Page 59: ......
Page 83: ......
Page 84: ......
Page 96: ......
Page 97: ......
Page 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Page 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Page 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Page 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Page 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Page 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Page 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Page 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Page 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...