5- 4
5.2 Boom Assembly
5.2.1 Cable
5.2.1.1 Disassembly
Plastic chain
Steel cable chain
Figure 5-3 Cable system disassembly
a.
Adjusting the boom to a fully retracted state.
b.
Disconnect the pipeline from the ground control box.
After the hydraulic line is disconnected, the port of the pipeline should be blocked immediately to
prevent dust and other pollutants from entering the hydraulic system.
a.
Mark and disconnect the hydraulic lines from base boom to the control valve. Collect the hydraulic
oil in the pipeline with a suitable container, and seal the port of the pipeline after collecting.
b.
Mark and disconnect the harness of the travel switch from the side of base boom.
c.
Mark and disconnect the hydraulic lines and harness from the telescopic boom to the upper leveling
cylinder, from the telescopic boom to the jib. Collect the hydraulic oil in the pipeline with a suitable
Moving tube1 Moving tube2
Cable
Fixed tube
1
2
3
4
Moving tube
Cable
Fixed tube
1
2
3
4
Summary of Contents for ZT20J
Page 8: ......
Page 9: ......
Page 17: ......
Page 18: ......
Page 25: ......
Page 26: ......
Page 43: ......
Page 44: ......
Page 58: ......
Page 59: ......
Page 83: ......
Page 84: ......
Page 96: ......
Page 97: ......
Page 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Page 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Page 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Page 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Page 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Page 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Page 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Page 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Page 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...