3-14
Table 3-4 Inspection and preventive maintenance schedule
(continuous)
Items
Time intervals
Pre-sta
rt
Weekly
Monthly
Pre-delivery
or daily
Annually
Every 2 years
Exhaust system
1,9
9
9
Batteries
5
1,9
19
Battery fluid
11
11
11
Battery charger
5
5
Fluid reservoir, cap and
breather
11,9
2
1,5
1,5
Hydraulic/Electrical system
9
Hydraulic pump
1,9
1,2,9
Hydraulic oil tank
1,9,7
2
1,2,9
1,2,9
Cylinder pinned joints and
pins retainer
1,9
1,2
1,2
Hydraulic hose and other
hydraulic fittings
1,9
12
1,2,9,12
1,2,9,12
Hydraulic oil tank, cap and
breather hole
11
1,9
2
1,5
1,5
24
Hydraulic oil filter
1,9
7
7
Hydraulic oil
11
7,11
7,11
Electrical connections
1
20
20
Instruments, meter, switch,
light and horn
1
5,23
General description
Operation and Safety
Manual in storage container
21
21
21
Equipped with ANSI and
EMI manual/guide
21
Summary of Contents for ZT20J
Page 8: ......
Page 9: ......
Page 17: ......
Page 18: ......
Page 25: ......
Page 26: ......
Page 43: ......
Page 44: ......
Page 58: ......
Page 59: ......
Page 83: ......
Page 84: ......
Page 96: ......
Page 97: ......
Page 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Page 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Page 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Page 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Page 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Page 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Page 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Page 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Page 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...