7-3
7.2.7 Resistance measurement
Figure 7-2 Resistance measurement
a.
First test the multimeter and leads by touching the two leads. The result should show a short circuit
of resistance (very low resistance).
b.
The circuit power must be turned off before testing the resistor.
c.
Disconnect each component from the circuit before testing.
d.
If the multimeter cannot automatically adjust the range, set the correct range (refer to the multimeter
operation manual).
e.
Make sure the multimeter leads are securely connected.
7.2.8 Conduction test
Figure 7-3 Conduction test
a.
The multimeter needs to use a separate button to initiate the continuity test of the beep.
b.
The circuit power must be turned off before testing the conduction.
c.
Disconnect each component from the circuit before testing.
d.
Make sure the multimeter leads are securely connected.
Summary of Contents for ZT20J
Page 8: ......
Page 9: ......
Page 17: ......
Page 18: ......
Page 25: ......
Page 26: ......
Page 43: ......
Page 44: ......
Page 58: ......
Page 59: ......
Page 83: ......
Page 84: ......
Page 96: ......
Page 97: ......
Page 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Page 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Page 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Page 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Page 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Page 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Page 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Page 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Page 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...