Table 3-4 Inspection and preventive maintenance schedule
Items
Time intervals
Pre-start
Weekly
Monthly
Pre-deliver
y or daily
Annually
Every 2
years
Boom assembly
9
Boom weldment
1,2,4
1,2,4
Oil pipe/wire rope
1,2,9,12
1,2,9,12
Shaft pin and pin
1,2
1,2
Pulley and pulley pins
1,2
1,2
Bearings
1,2
1,2
Wear pad
1,2
1,2
Covers or shields
1,2
1,2
Cables or wire
1,2,3
1,2,3
Platform assembly
9
Platform
1,2
1,2
Railing
1,2
1
1,2
Door
5
1
1,5
Floor
1,2
1
1,2
Rotary motor
9,5
15
Lanyard anchorage
2
1,2,10
1,2,10
Turntable assembly
9
Swing bearing or worm
gear
1,2,14
1,2,3,13,14
Swivel joint
9
Turntable drive system
Turntable pin
1,2,5
1,2,5
Hood, hood props and
hood latches
5
1,2,5
Chassis assembly
9
Tire
1
16.17
16,17,18
16,17,18
Wheel nuts/screw
1
15
15
15
Wheel bearing
14,24
Oscillating axle/Lockout
cylinder system
5,8
Outrigger or extendable
axle
5,8
5,8
Summary of Contents for ZT20J
Page 8: ......
Page 9: ......
Page 17: ......
Page 18: ......
Page 25: ......
Page 26: ......
Page 43: ......
Page 44: ......
Page 58: ......
Page 59: ......
Page 83: ......
Page 84: ......
Page 96: ......
Page 97: ......
Page 105: ...7 8 Figure 7 11 Electrical Schematics Figure 1 6 Perkins engine ...
Page 106: ...7 9 Figure 7 12 Electrical Schematics Figure 1 6 Deutz D447 engine ...
Page 107: ...7 10 Figure 7 13 Electrical Schematics Figure 1 6 Deutz D2 9 engine ...
Page 108: ...7 11 Figure 7 14 Electrical Schematics Figure 2 6 ...
Page 109: ...7 12 Figure 7 14 Electrical Schematics Figure 3 6 ...
Page 110: ...7 13 Figure 7 16 Electrical Schematics Figure 4 6 ...
Page 111: ...7 14 Figure 7 17 Electrical Schematics Figure 5 6 ...
Page 112: ...7 15 Figure 7 18 Electrical Schematics Figure 6 6 ...
Page 113: ...7 16 7 5 Hydraulic Schematics Figure 7 19 Hydraulic Schematics Figure ...