5-10
Preparations for start-up
61211-1020202
CenterMax Operating Instructions
The holders are generally preassembled. The procedure for moving,
removing or adding a holder is described in the following.
A
Cap
B
Holder for probe system VAST;
a: top plan view;
b: front view
1 Mounting aid
2 Screw; M6×16
3 Cover of a holder
4 Brush for cleaning the adapter plate
• Remove the cap (
A
).
• Move the cover of the holder in the direction of the arrow (3) and
loosen the two hexagon-socket screws (2) slightly;
do not
remove
them completely from the mounting aid.
• Slide the holder on the profile rail.
The mounting aid must be guided in the profile rail.
• Proceed in the same way for sliding further holders on the profile
rail.
The permissible number depends on the probe system and the pro-
file rail length.
• Reattach the cap to the profile rail.
Summary of Contents for CenterMax
Page 1: ...Operating Instructions CenterMax Coordinate measuring machine for series production...
Page 9: ...61211 1020202 Operating Instructions Contents7 Appendix Application examples 1...
Page 10: ...61211 1020202 Operating Instructions Contents 8...
Page 14: ...Foreword 61211 1020202 Operating Instructions...
Page 26: ...1 12 Introduction 61211 1020202 CenterMax Operating Instructions...
Page 58: ...3 6 Technical data 61211 1020202 CenterMax Operating Instructions...
Page 64: ...4 6 Transport and installation 61211 1020202 CenterMax Operating Instructions...
Page 80: ...5 16 Preparations for start up 61211 1020202 CenterMax Operating Instructions...
Page 100: ...6 20 Start up 61211 1020202 CenterMax Operating Instructions...
Page 134: ...7 34 Measuring operation 61211 1020202 CenterMax Operating Instructions...
Page 144: ...8 10 Errors and faults 61211 1020202 CenterMax Operating Instructions...
Page 156: ...9 12 Maintenance and care 61211 1020202 CenterMax Operating Instructions...
Page 162: ...61211 1020202 Operating Instructions Glossary 2...
Page 164: ...61211 1020202 Operating Instructions Appendix 2...
Page 165: ......