Start-up checklist
6-19
CenterMax Operating Instructions
61211-1020202
Start-up checklist
Clamping the workpiece
–
Is the workpiece in the correct position?
➤
page 6-3
.
–
Is it possible to measure all workpiece dimensions in one cycle?
–
Is measurement possible without collision? E.g. collision with the
probe rack.
–
Is the workpiece clamped?
➤
page 6-3
.
Switching on the CMM
–
Has the CMM been switched on in the correct order?
➤
page 6-5
.
–
Is the power supply connected?
–
Control cabinet switched on?
–
Drives switched on?
–
Operating mode selected?
–
Computer switched on?
–
Measuring software started?
Protective circuit for the driving forces
–
Has the protective circuit been checked?
➤
page 6-8
.
Probe assembly
–
Have the criteria for probe assembly been observed?
➤
page 6-13
.
–
Have the limiting values for the probe been observed?
➤
page 6-14
.
Summary of Contents for CenterMax
Page 1: ...Operating Instructions CenterMax Coordinate measuring machine for series production...
Page 9: ...61211 1020202 Operating Instructions Contents7 Appendix Application examples 1...
Page 10: ...61211 1020202 Operating Instructions Contents 8...
Page 14: ...Foreword 61211 1020202 Operating Instructions...
Page 26: ...1 12 Introduction 61211 1020202 CenterMax Operating Instructions...
Page 58: ...3 6 Technical data 61211 1020202 CenterMax Operating Instructions...
Page 64: ...4 6 Transport and installation 61211 1020202 CenterMax Operating Instructions...
Page 80: ...5 16 Preparations for start up 61211 1020202 CenterMax Operating Instructions...
Page 100: ...6 20 Start up 61211 1020202 CenterMax Operating Instructions...
Page 134: ...7 34 Measuring operation 61211 1020202 CenterMax Operating Instructions...
Page 144: ...8 10 Errors and faults 61211 1020202 CenterMax Operating Instructions...
Page 156: ...9 12 Maintenance and care 61211 1020202 CenterMax Operating Instructions...
Page 162: ...61211 1020202 Operating Instructions Glossary 2...
Page 164: ...61211 1020202 Operating Instructions Appendix 2...
Page 165: ......