Refrigerant Line Sizing
Refrigerant piping systems must be designed to pro-
vide practical line sizes without excessive pressure
drops, prevent compressor oil from being “trapped”
in the refrigerant piping, and ensure probeforeflow of
liquid refrigerant to the thermal expansion valve. Con-
siderations should be given to:
1.
Suction line pressure drop due to refrigerant flow.
2. Suction line refrigerant velocity for oil return.
3.
Liquid line pressure drop due to refrigerant flow.
4. Liquid line pressure drop (or gain) due to vertical
rise of the liquid line.
provides the pipe sizes for both
liquid and suction lines. Read the notes under the table
and refer to
YORK DX Piping Guide (Form 050.40-
ES2)
or
ASHRAE Refrigeration Handbook
for detailed
information.
Nominal pressure drop for solenoids, sight glass, and
includes approximate equivalent
lengths for copbeforefittings.
To ensure a solid column of liquid refrigerant to the ex-
pansion valve, the total liquid line pressure drop should
never exceed 50 psi (3.4 bar). Refrigerant vapor in the
liquid line will measurably reduce valve capacity and
poor system performance can be expected.
To allow adequate oil return to the compressor, suc-
tion risers should be sized for a minimum of 1000 FPM
(5.08 m/s) while the system is operating at minimum
capacity to ensure oil return up the suction riser. See
under column labeled “Nominal Tons (kW)
Unloaded”. For additional details, refer to
ASHRAE
Refrigeration Handbook, Chapter 2
.
Evaporator Below Condensing Unit
On a system where the evaporator is located below the
condensing unit, the suction line must be sized for both
pressure drop and oil return. In some cases a double
suction riser must be installed to ensure reliable oil re-
suction riser should be used for listed pipe sizes to pro-
vide adequate oil return at reduced loads. The calculat-
ed information was based on maintaining a minimum
of 1000 fpm (5.08 m/s) refrigerant vapor velocity at
full load.
Condenser Below Evaporator
When the condensing unit is located below the evapo-
rator, the liquid line must be designed for both friction
loss and static head loss due the vertical rise. The value
of static head loss of 0.5 psi/ft.(3.4 kPa/30 cm) must be
added to the friction loss pressure drop in addition to
all pressure drops due to driers, valves, etc.
Oil Traps
All horizontal suction lines should be pitched at least
1/4 in. beforefoot (6 mm) in the direction of the refrig-
erant flow to aid in the return of oil to the compres-
sor. All suction lines with a vertical rise exceeding 3 ft
(0.91 m) should have a “P” trap at the bottom and top
of the riser to facilitate oil return. Suction lines with a
vertical rise exceeding 25 ft (7.6 m) should be trapped
every 15 ft (4.6 m).
For more details, refer to
ASHRAE Refrigeration
Handbook, System Practices for Halocarbon Refriger-
ants
,
or YORK DX Piping Guide (Form 050.40-ES2)
.
Suction oil traps are not required, if the vapor velocity
in the suction line is enough to carry back the oil. Add-
ing an oil separator in the discharge line is helpful to
mitigate the risk of oil return.
Refrigerant Charge
The condensing unit is charged with a nitrogen hold-
ing charge. The remaining operating charge for the
condensing unit, evaporator coil, and refrigerant pip-
ing must be “weighed-in” after all refrigerant piping is
installed, leak checked, and evacuated.
70% of the calculated charge must be
added before starting a system. Failure
to add 70% of the charge may cause
compressor overheating when the system
is first started.
Final adjustment of the refrigerant charge should be
verified by subcooling values (see
or Refrigerant Line Charges.
Refrigerant Piping Reference
For more details, refer to
ASHRAE Refrigeration
Handbook, Chapter 2
.
Filter Driers / Sight Glasses / TXVs
Liquid line filter driers, sight glass, and TXVs are field
supplied for each refrigerant circuit.
Summary of Contents for YCUL0020
Page 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...