SECTION 4 – INSTALLATION
Table 3 -
Miscellaneous Liquid Line Pressure Drops
*MISCELLANEOUS LIQUID LINE PRESSURE
SOLENOID VALVE
2 psi to 3 psi (13.8 kPa to 20.7 kPa)
FILTER/DRIER
2 psi to 3 psi (13.8 kPa to 20.7 kPa)
SIGHT GLASS
0.5 psi (3.4 kPa)
*Pressure drops or equivalent length values are approximate. If more precise value is desired, consult ASHRAE Refrigerant Handbook.
Refrigerant Piping
Notes
1. Based on R-410A at the nominal capacity of the unit or system, an ambient temperature of 95°F (35°C) and a suction temperature of 45°F
(7.2°C).
2. Suction line sizes were calculated based on a nominal maximum pressure drop to 3 psi/100 ft. (20.7 kPa/30.5 m). When calculating suction
line pressure drop for a specific application, it should be noted that system capacity decreases as suction line pressure drop increases.
3. Nominal Tons (kW) Unloaded is based on one compressor (beforesystem) operating at design conditions.
4. Based on minimum compressor staging for the given pipe size, a double suction riser should be used to ensure probeforeoil return to the
compressor on all vertical suction risers. Oil returning up the riser moves up the inner surface of the pipe and depends on the mass velocity
of the refrigerant vapor at the wall surface to move the oil up the vertical rise.
5.
Hot gas bypass lines are typically 7/8 in. for lines up to 40 ft and 1 1/8 in. for lines over 40 ft in length (12 m). The field connections sizes
are 7/8 in. for the optional factory mounted hot gas bypass valve. Note: Hot gas bypass is only available for refrigerant system number 1.
6. For more information, refer to either the
YORK DX Piping Guide
(
Form 050.40-ES2
) or the
ASHRAE Refrigertion Handbook
.
Table 4 -
Refrigerant Line Connections
YCUL
TONS
SYSTEM
NUMBER
COPBEFORETYPE L
INCHES OD
NOMINAL TONS
(kW)
UNLOADED
SUCTION
LIQUID
0020EE
17.0
1
1-5/8
7/8
8.5
0024EE
20.1
1
1-5/8
7/8
10.1
0031EE
27.0
1
2-1/8
1-1/8
12.3
0035EE
30.9
1
2-1/8
1-1/8
15.5
0045EE
41.6
1
2-1/8
1-1/8
10.4
2
2-1/8
1-1/8
10.4
0051EE
44.1
1
2-1/8
1-1/8
11.7
2
2-1/8
1-1/8
10.4
0055EE
51.6
1
2-1/8
1-1/8
12.9
2
2-1/8
1-1/8
12.9
0065EE
59.5
1
2-1/8
1-1/8
14.9
2
2-1/8
1-1/8
14.9
0072EE
73.5
1
2-3/8
1-1/8
21.9
2
2-1/8
1-1/8
14.9
Hot gas bypass is only available for
refrigerant system number 1.
Summary of Contents for YCUL0020
Page 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...