![background image](http://html1.mh-extra.com/html/york/ycul0020/ycul0020_installation-operation-and-maintenance-manual_4219906125.webp)
JOHNSON CONTROLS
125
SECTION 7 – UNIT CONTROLS
Form 150.63-NM9
Issue date: 5/20/2021
7
Entry keys
00068VIP
The ENTRY keys allows the user to view, change
programmed values. The ENTRY keys consist of an
↑ (UP) arrow key, ↓ (DOWN) arrow key, and an EN
-
TER/ADV key.
Up and down arrow keys
Used in conjunction with the OBeforeDATA, HIS-
TORY, COOLING SETPOINTS, SCHEDULE/AD-
VANCE DAY, OPTIONS and CLOCK keys, the ↑
(UP) and ↓ (DOWN) arrow keys allow the user to scroll
through the various data screens. Refer to the section
on “Display/Print” keys for specific information on the
displayed information and specific use of the ↑ (UP)
and ↓ (DOWN) arrow keys.
The ↑ (UP) arrow key and ↓ (DOWN) arrow key are
also used for programming the control panel such as
changing numerical or text values when programming
cooling setpoints, setting the daily schedule, changing
safety setpoints, unit options, and setting the clock.
Enter/Adv key
The ENTER/ADV key must be pushed after any change
is made to the cooling setpoints, daily schedule, safety
setpoints, chiller options, and the clock. Pressing this
key “enters” the new values into memory. If the EN-
TER/ADV key is not pressed after a value is changed,
the changes will not be “entered” and the original val-
ues will be used to control the chiller.
Programming and a description on the use of the ↑ (UP)
arrow key, and ↓ (DOWN) arrow, and ENTER/ADV
keys are covered in detail under the SETPOINTS, and
UNIT keys.
Summary of Contents for YCUL0020
Page 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...