System Run Contacts
Contacts are available to monitor system status. Normal-
ly-open auxiliary contacts from each compressor contac-
tor are wired in parallel with TB1 – Terminals 25 to 26 for
system 1, and TB1 – Terminals 27 to 28 for system 2. See
Figure 4 on page 22, Figure 11 on page 39,
and the
unit wiring diagrams starting on
Alarm Status Contacts
Normally-open contacts are available for each refriger-
ant system. These normally-open contacts close when
the system is functioning normally. The respective
contacts will open when the unit is shut down on a unit
fault, or locked out on a system fault. Field connections
are at TB1 - Terminals 29 to 30 (system 1), and Termi-
nals 31 to 32 (system 2).
Remote Start/Stop Contacts
To remotely start or stop a single circuit unit, wire a
dry contact in series with the flow switch and then con-
nect it to terminals 13 to 51 of CTB1. See
page 22, Figure 11 on page 39,
and the unit wiring
diagrams starting on
To remotely start or stop a dual system unit, individu-
ally wire two dry contacts in series with the correspon-
dent thermostat, then respectively connect them to ter-
minals 13 to 51 (System #1) and 13 to 50 (System #2)
of CTB1, as shown left on
. The other option is
to wire only one dry contact to the common wire con-
nected to terminal 13 of CTB1, as shown on the right
on
. See
Figure 4 on page 22, Figure 11 on
and the unit wiring diagrams starting on
Figure 8 -
Wiring Options for Remotely Start or Stop
the Dual System Unit
LD28300
13
20
13
13
21
14
51
13
50
CBT1
Dry Contact of System #1
Dry Contact of System #2
13
13
20
21
14
13
51
13
50
CBT1
Single Dry Contact
Remote Emergency Cutoff
Immediate shutdown of the chiller can be accomplished
by opening a field-installed dry contact to break the
electrical circuit between Terminals 5 to L on Terminal
Block TB1. The unit is shipped with a factory jumbe-
foreinstalled between Terminals 5 to L, which must be
removed if emergency shutdown contacts are installed.
See
and the unit wiring diagrams
Remote Temp Reset Input
The Remote Temp Reset input allows reset of the dis-
charge air temperature setpoint by supplying a voltage
or current signal field wiring should be connected to
CTB1 – Terminals A+ to A-. A detailed explanation is
provided in the Unit Control section. See
and the unit wiring
Load Limit Input
Load limiting is a feature that prevents the unit from
loading beyond a desired value. The unit can be “load
limited” either 33%, 40%, 50%, 66% or 80%, depend-
ing on the number of compressors on unit. The field
connections are wired to CTB1 – Terminals 13 to 21,
and work in conjunction with the PWM inputs. A de-
tailed explanation is provided in the Unit Control sec-
tion. See
Figure 4 on page 22, Figure 11 on page 39
and the unit wiring diagrams starting on
When using the Load Limit feature, the
PWM feature will not function – SIMUL
-
TANEOUS OPERATION OF LOAD
LIMITING AND TEMPERATURE
RESET (PWM INPUT) CANNOT BE
DONE.
Liquid Line Solenoid Connections
The field supplied and installed liquid line solenoid
valves should be installed at the evaporator and wired
using 18 AWG minimum wire. Electrical connections
should be made at Terminal Board TB1. TB1 is located
in the power panel on the left side of the power panel.
Note that power for the solenoid coil is 120 VAC
.
See
and the unit wiring diagrams
Summary of Contents for YCUL0020
Page 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...