Option 18 – Hot Gas Bypass Type
The Hot Gas Bypass Type must be programmed based
on the option installed. Some chillers will not have hot
gas bypass installed. Others will have it installed on
System #1, System #2 or both systems.
The selected option is only displayed under the OP-
TIONS key and must be programmed under the Ser-
vice Mode.
H O T G A S B Y P A S S T Y P E
N O N E
H O T G A S B Y P A S S T Y P E
S Y S T E M 1
H O T G A S B Y P A S S T Y P E
S Y S T E M 2
H O T G A S B Y P A S S T Y P E
B O T H S Y S T E M S
Option 19– Data Logging
This should be disabled.
D A T A L O G T O F L A S H C A R D
O
F
F
Also see the Unit Keys Programming Quick Refrence
List in
.
Clock
The CLOCK display shows the current day, time, and
date. Pressing the CLOCK key will show the current
day, time, and date.
It is important that the date and time be correct, other-
wise the daily schedule will not function as desired if
programmed. In addition, for ease of troubleshooting
via the History printouts, the day, time, and date should
be correct.
To change the day, time, and date press the CLOCK
key. The display will show something similar to the
following:
T O D A Y I S F R I 0 8 : 5 1 A M
2 5 J A N 0 8
The line under the F is the cursor. If the day is correct,
press the ENTER/ADV key. The cursor will move un-
der the 0 in 08 hours. If the day is incorrect, press the
↑ (UP) or ↓ (DOWN) arrow keys until the desired day
is displayed and then press the ENTER/ADV key at
which time the day will be accepted and the cursor will
move under the first digit of the “2 digit hour”. In a
similar manner, the hour, minute, meridian, month, day,
and year may be programmed, whenever the cursor is
under the first letter/numeral of the item. Press the ↑
(UP) or ↓ (DOWN) arrow keys until the desired hour,
minute, meridian; day, month, and year are displayed.
Pressing the ENTER/ADV key will save the valve and
move the cursor on to the next programmable variable.
Summary of Contents for YCUL0020
Page 4: ...JOHNSON CONTROLS 4 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 10: ...JOHNSON CONTROLS 10 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 14: ...JOHNSON CONTROLS 14 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 40: ...JOHNSON CONTROLS 40 Form 150 63 NM9 Issue date 5 20 2021 THIS PAGE IS INTENTIONALLY LEFT BLANK...
Page 53: ...JOHNSON CONTROLS 53 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 55: ...JOHNSON CONTROLS 55 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 57: ...JOHNSON CONTROLS 57 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 59: ...JOHNSON CONTROLS 59 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 61: ...JOHNSON CONTROLS 61 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 63: ...JOHNSON CONTROLS 63 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 65: ...JOHNSON CONTROLS 65 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 67: ...JOHNSON CONTROLS 67 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 69: ...JOHNSON CONTROLS 69 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 71: ...JOHNSON CONTROLS 71 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 73: ...JOHNSON CONTROLS 73 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 75: ...JOHNSON CONTROLS 75 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 77: ...JOHNSON CONTROLS 77 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 79: ...JOHNSON CONTROLS 79 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 81: ...JOHNSON CONTROLS 81 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 83: ...JOHNSON CONTROLS 83 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 85: ...JOHNSON CONTROLS 85 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 87: ...JOHNSON CONTROLS 87 Section 5 Technical data Form 150 63 NM9 Issue date 5 20 2021 5...
Page 177: ...JOHNSON CONTROLS 177 Form 150 63 NM9 Issue date 5 20 2021 Notes...