
Toc-6
IM 11M12A01-02E 16th Edition : Mar. 19, 2020-00
Operation of Blow back ....................................................................10-8
Setting Output Hold Time and Blow back Time ...............................10-9
Setting Interval, Start Date, and Start Time .....................................10-9
Default Setting................................................................................10-10
Handling of the ZO21S Standard Gas Unit
.................................................10-17
Standard Gas Unit Component Identification
................................10-18
Installing Gas Cylinders .................................................................10-19
Calibration Gas Flow ......................................................................10-19
Methods of Operating Valves in the ZA8F Flow Setting Unit
Preparation Before Calibration ......................................................10-22
Operating the Span Gas Flow Setting Valve .................................10-22
Operating the Zero Gas Flow Setting Valve ..................................10-22
Operation After Calibration ............................................................10-23
11. Inspection and Maintenance
................................................................. 11-1
Inspection and Maintenance of the Detector
............................................... 11-1
Cleaning the Calibration Gas Tube .................................................. 11-1
Replacing the Sensor Assembly ...................................................... 11-2
Replacement of the Heater Unit ...................................................... 11-4
Replacement of Dust Filter .............................................................. 11-6
Replacement of O-ring ..................................................................... 11-6
Cleaning the High Temperature Probe Adapter ............................... 11-7
Stopping and Re-starting Operation ................................................ 11-7
Inspection and Maintenance of the Converter
............................................ 11-8
Replacing Fuses .............................................................................. 11-8
Adjust LCD screen contrast ............................................................. 11-9
Replacing Flowmeter in ZR40H Automatic Calibration Unit ...................... 11-9
..................................................................................... 12-1
Displays and Remedies When Errors Occur
...............................................12-1
Remedies When an Error Occurs ....................................................12-2
Displays and Remedies When Alarms are Generated
................................12-4
Remedies When Alarms are Generated ..........................................12-5
Countermeasures When Measured Value Shows Error
........................... 12-11
12.3.1
Measured Value Higher (Lower for Humidity Analyzer)Than True Value . 12-11
12.3.2
Measured Value Lower (Higher for Humidity Analyzer) Than True Value 12-12
Measurements Sometimes Show Abnormal Values .....................12-13
Summary of Contents for EXAxt ZR22G
Page 15: ...Blank Page...
Page 51: ...Blank Page...
Page 77: ...Blank Page...
Page 137: ...Blank Page...
Page 171: ...Blank Page...
Page 195: ...Blank Page...
Page 197: ......
Page 199: ......
Page 201: ......
Page 203: ......
Page 205: ......
Page 207: ......
Page 211: ...Blank Page...