background image

16583-P

Call Us First!

DO NOT RETURN TO STORE.

For questions on assembly or for general inquiries, you may contact us in the following ways:

Call customer service:

 1-877-743-3400

Did you enjoy building your shed? 

JOIN OUR TEAM

AND MAKE UP TO $1,500/WEEK*

o

r

 

vis

i

t b

a

cky

ard

in

st

a

l

l

er.

co

m

Flexible schedule 

No selling,

just building

Bonus incentives 

available

S

ca

n

 th

f

 owc

o

de 

t

a

p

ply 

to

d

a

y

.

INSTALLERS

WANTED

*based on number of completed installations

Call a Recruiter Today!  734-365-7000

visit us online at

help.backyardproducts.com

AVOID THE WAIT!

Submit a help request
Answers to frequently asked questions
Live chat with an agent

Summary of Contents for BRAXTON

Page 1: ...EAM AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based on number of completed installations Call a Recruiter Today 734 365 7000 visit us online at help backyardproducts com AVOID THE WAIT Submit a help request Answers to frequently asked questions Live ...

Page 2: ... This page intentionally left blank ...

Page 3: ...ur Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 7 CHECK ALL PARTS Inventory all parts listed on pages 14 16 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 4 5 for r...

Page 4: ...quired to protect the floor at the door opening Wood floors only Follow the door manufacturer s recommendations Kit door opening is 97 246 3 cm Wide x 69 175 2 cm High AN OVERHEAD DOOR IS NOT AVAILABLE FROM YARDLINE USE INSTRUCTIONS SUPPLIED WITH THE DOOR MANUFACTURER TO FRAME IN YOUR FRONT WALL DOOR OPENING PROVIDE THIS PAGE TO THE DOOR MANUFACTURER 7 213 3 cm Wall Height 7 213 3 cm Wall Height 8...

Page 5: ... assembly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C A Safety Glasses Tape Measure Paint Tools Ladder Caulk G...

Page 6: ...EDGE Feet 80 ADDITIONAL MATERIALS COMPLETING YOUR SHED You will need these additional materials OPTIONAL MATERIALS REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT THIS KIT DOES NOT INCLUDE ANY FOUNDATION OR FLOOR MATERIALS 15 ROOFING FELT Sq ft to cover 432 1 GALVANIZED ROOFING NAILS lbs 1 lb For roofing felt See page 5 for a CON...

Page 7: ...ding Size A treated 2 x 4 5 1 x 10 2 cm sill plate is required when installing your shed on concrete Purchase full length treated lumber or butt shorter pieces end to end and seal seams with caulk Use a high quality exterior grade caulk beneath all sill plates or use sill tape Fasten 2 x 4 5 1 x 10 2 cm sill plates to slab using approved concrete anchors fasteners not included 144 365 8 cm 281 713...

Page 8: ...D WOOD FLOOR FRAME NOTE Depending upon the weight of items you will be storing on your wood floor you may choose to use 2 x 10 x 12 or 2 x 12 x 12 treated lumber for increased floor strength x29 x29 2 x 10 x 12 5 1 x 25 4 x 365 8 cm Treated Lumber 2 x 12 x 12 5 1 x 30 5 x 365 8 cm Treated Lumber x29 2 x 8 x 144 5 1 x 20 3 x 365 8 cm Treated Lumber TREATED x156 3 7 6 cm TREATED TREATED REINFORCED F...

Page 9: ...age use gravel under each concrete block LEVELING METHODS MATERIAL REQUIRED 4 x 4 x 12 10 2 x 10 2 x 305 cm Treated Lumber x6 x150 Use only wood treated for ground contact and fasteners approved for use with treated wood Always support frame seams Leveling higher than 16 not recommended LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles 12 x ...

Page 10: ...the frame to 4x4 runners using one fastener at ends of each runner making sure the frame remains square Fig A Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners Fig B See page 7 for the preferred floor leveling method FINISH LEVEL AND SQUARE FLOOR FRAME Before attaching floor decking it is important to level and square the floor frame A level...

Page 11: ... x 8 x 144 5 1 x 20 3 x 365 8 cm TREATED x156 3 7 6 cm Nail using 3 3 nails at each location Fig A Use 6 3 nails at seams Fig B HINT 3 7 6 cm Nails Fig A Fig B You have finished assembling your floor frame FINISH 3 Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 322 Fi...

Page 12: ...48 121 9 cm Install a 48 x 96 panel flush to the outside edges of the floor frame Use GAA gauge block to maintain 3 4 on floor joist Secure panel using 2 nails 6 apart on edges and 12 apart inside panel 2 Flush Flush Flush Flush Flush 12 30 5 cm Install next two 48 x 96 panels on frame and flush to the installed panel and outside of frame Use GAA gauge block to maintain 3 4 on floor joist Secure p...

Page 13: ...s using 2 nails 6 apart on edges and 12 apart inside panel 4 3 5 Cut one 1 48 x 96 panel in half to get two 48 x 48 panels These panels are cut so that all floor panels are staggered Install 48 x 48 panel flush to the outside edge of the floor frame and flush to the installed panel Use GAA gauge block to maintain 3 4 on floor joist Secure panel using 2 nails 6 apart on edges and 12 apart inside pa...

Page 14: ...8 x 96 floor panels on frame flush to the outside edge of the floor frame and flush to installed panels Use GAA gauge block to maintain 3 4 on floor joists Secure panels using 2 nails 6 apart on edges and 12 apart inside panel 6 6 15 2 cm Flush Flush Flush Flush 12 30 5 cm FINISH You have finished building your floor 3 4 Gauge Block 3 4 Gauge Block ...

Page 15: ...ce for wall construction Organize your assembly procedure during the build process to avoid over handling of the walls HINT SIDE WALL SIDE WALL FRONT WALL BACK WALL D O O R STOP STOP Check the floor frame is level after installing floor panels Re level if needed ...

Page 16: ... OSB x10 4 4 x 5 1 2 x 57 15 16 2 5 x 14 0 x 147 2 cm ROS 2 x 4 x 81 7 8 5 1 x 10 2 x 208 cm x26 XYA 3 8 x 3 x 83 1 2 1 x 7 6 x 212 1 cm x14 3 8 x 3 x 43 1 8 1 x 7 6 x109 5 cm x2 2 x 4 x 23 7 16 5 1 x 10 2 x 59 5 cm x2 JYA 2 x 4 x 35 5 1 x 10 2 x 88 9 cm x2 QT 2 x 4 x 23 5 1 x 10 2 x 58 4 cm x4 TTA 2 x 4 x 20 1 2 5 1 x 10 2 x 52 1 cm x4 RP 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm x6 AO 2 x 4 x 6 1 2 5 ...

Page 17: ... 7 8 x 84 1 x 60 6 x 213 4 cm 3 8 x 11 1 4 x 48 1 x 28 6 x 121 9 cm 3 8 x 40 1 4 x 48 1 x 102 2 x 121 9 cm ROOF PANELS Roof panels are 7 16 1 1 cm thick x6 x4 x4 48 x 96 121 9 x 243 8 cm 39 3 4 x 96 101 0 x 243 8 cm 48 x 39 3 4 121 9 x 101 0 cm x1 UNIVERSAL DOOR Right Left x3 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x4 3 8 x 23 7 8 x 84 1 x 60 6 x 213 4 cm x1 3 8 x ...

Page 18: ... 105 4 cm NSA x4 19 32 x 3 1 2 x 41 1 5 x 8 9 x 104 1 cm x2 Vent 19 32 x 3 1 2 x 8 3 8 1 5 x 8 9 x 16 5 cm x4 FTA x2 1 x 3 x 69 3 4 2 5 x 7 6 x 177 2 cm x4 XSA 19 32 x 3 1 2 x 72 3 8 1 5 x 8 9 x 183 8 cm x2 ZP 19 32 x 2 1 2 x 72 1 5 x 6 3 x 182 9 cm x1 ZJ 19 32 x 2 1 2 x 26 5 8 3 2 x 6 3 x 67 6 cm x2 AH x4 x12 2 5 1 cm x12 3 7 6 cm 3 16 x 46 1 2 x 48 0 5 x 118 1 x 121 9 cm Pegboard Door Backer Boa...

Page 19: ...indow assemblies shown below LOCATION INDICATORS Window Assembly x3 Door Assembly x1 As you begin to construct your walls look for the location indicator in the instructions to reflect on your window and door assembly placement options You have the opportunity to customize the look of your new Garage by putting the door and window assemblies in any of the locations shown below STOP STOP ...

Page 20: ...m YFA x2 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 2 x 4 x 7 5 1 x 10 2 x 17 8 cm x2 AL You have finished assembling your door frame FINISH Carefully set the door frame aside 2 x 4 x 35 5 1 x 10 2 x 88 9 cm x2 QT DOOR FRAME Assemble header to frame using 2 3 nails at each location Fig C Fig C YFA AI AI QT AL 3 7 6 cm Nails 3 7 6 cm Nails 3 7 6 cm Nails Fig A Flush Flush QT 9 1 2 24 1 cm 25 1 2 64 7 ...

Page 21: ...3 1 BEGIN HINT x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI You have finished assembling your 3 window frames Carefully set the window frames aside FINISH 2 x 4 x 22 1 2 5 1 x 10 2 x 57 1 cm AO x6 2 x 4 x 38 1 2 5 1 x 10 2 x 97 8 cm x3 PZA 2 x 4 x 7 5 1 x 10 2 x 17 8 cm x3 AL WINDOW FRAME Repeat steps 1 2 to build two more window frames Fig A AL PZA AI AO AI 3 7 6 cm Nails ...

Page 22: ... 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA PARTS REQUIRED 2 Orient parts on edge on floor Measure and mark from end of boards Use 2 3 nails at each connection and 4 3 nails at seams Toe nail at seams SIDE WALL A FRAME 3 7 6 cm x104 x10 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 1 BEGIN 1 2 x 4 x 20 1 2 5 1 x 10 2 x 52 1 cm x2 RP At this time add in any window door ...

Page 23: ...IN PARTS REQUIRED Measure and mark locations for two studs AI in chosen 48 wall opening location Place two AI in 48 wall opening Secure studs using 2 3 nails at each location x8 16 3 4 42 5 cm 32 3 4 83 2 cm x2 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI ...

Page 24: ... cm Nails 2 1 BEGIN Window Frame Pre assembled PARTS REQUIRED Measure and mark window frame at chosen 48 wall opening Install window frame using 2 3 nails at each location x36 12 3 4 32 4 cm 36 3 4 93 3 cm 24 3 4 62 9 cm x3 ...

Page 25: ...e and mark frame locations for door frame at chosen 48 wall opening location Place door frame in 48 wall opening Check frame studs are at measurements shown and square at bottom Secure door frame using 2 3 nails at each location x16 6 1 2 14 6 cm 16 3 4 42 5 cm 32 3 4 83 1 cm 43 109 2 cm 32 81 3 cm ...

Page 26: ...shed building side wall A FINISH x384 Flush Flush Flush Flush Flush x2 3 8 x 48 x 84 1 x 121 9 x 213 4 cm 3 4 GAUGE BLOCK G A A To draw panels tight at seams angle nail 1 1 2 3 8 cm D O O R BEGIN HERE Page 25 12 30 5 cm 6 15 2 cm 23 7 8 60 6 cm 23 7 8 60 6 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm Primed Side UP Refer to pages 25 28 for detailed window door and solid wall pane...

Page 27: ...will be 1 1 2 above top plate Use GAA as a gauge block to check the 3 4 side measurement on the wall stud 2 Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel 1 BEGIN 12 30 5 cm 3 4 Gauge Block 6 15 2 cm 3 4 1 9 cm For squareness maintain 3 4 measurement along panel edge BEGIN HERE 1 Primed side UP 1 1 2 3 8 cm 3 1 2 8 9 cm D O O R 23 7 8 60 6 cm ...

Page 28: ...8 cm x1 3 8 x 48 x 84 1 x 121 9 x 213 4 cm Place 48 x 84 window panel flush to the installed panel Measure and locate the panel 1 1 2 above the top plate Use the gauge block to check the 3 4 side measurement on the wall stud Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel 2 1 BEGIN D O O R 48 121 9 cm ...

Page 29: ...4 1 x 121 9 x 213 4 cm Place 48 x 84 panel flush to the installed panel Measure and locate the panel 1 1 2 above the top plate Use the gauge block to check the 3 4 side measurement on the wall stud Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel 2 1 BEGIN 3 4 Gauge Block Primed side UP D O O R 48 121 9 cm ...

Page 30: ...led panel Measure and locate the panel 1 1 2 above the top plate Use the gauge block to check the 3 4 side measurement on the wall stud Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel 2 1 BEGIN 3 4 GAUGE BLOCK G A A 3 4 Gauge Block D O O R PARTS REQUIRED 48 121 9 cm 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 ...

Page 31: ...243 8 cm TP x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA PARTS REQUIRED 2 Orient parts on edge on floor Measure and mark from end of boards Use 2 3 nails at each connection and 4 3 nails at seams Toe nail at seams SIDE WALL B FRAME 3 7 6 cm x104 x10 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 1 BEGIN 1 2 x 4 x 20 1 2 5 1 x 10 2 x 52 1 cm x2 RP At this time add in any window door and solid wall frames to ...

Page 32: ...6 cm To draw panels tight at seams angle nail 1 1 2 3 8 cm D O O R 12 30 5 cm 6 15 2 cm 48 121 9 cm 23 7 8 60 6 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 48 121 9 cm 3 8 x 48 x 84 1 x 121 9 x 213 4 cm x1 Primed Side UP Flush Flush Install panels prime side up 1 1 2 above top plate using 2 nails 6 apart on edges and 12 apart inside panel 3 Refer to pages 25 28 for detailed window door and solid wall p...

Page 33: ... 199 4 cm AI x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP AI x10 1 BEGIN Orient parts on edge on floor as shown Nail using 2 3 nails at each connection Use 4 nails at seams 2 3 7 6 cm Nails You have finished building your back wall frame FINISH HINT TP TP SP SP Flush Flush Flush Flush DOOR See page 17 At this time add in any window door or solid wall frames to the 48 frame openings Refer to pages 21 23 ...

Page 34: ... 2 cm 48 121 9 cm BEGIN HERE Primed side UP Place left 48 x 84 panel on frame and 1 1 2 across top of wall frame Use GAA as a gauge block to check the 3 4 side measurement on the wall stud 2 Secure the panel using 2 nails 6 apart on edges and 12 apart inside panel 1 BEGIN 1 3 4 1 9 cm DOOR 1 1 2 3 8 cm Refer to pages 25 28 for detailed window and door panel instructions NOTE Wall shown is a generi...

Page 35: ...lush Flush Primed side UP 3 Place 2nd and 3rd 48 x 84 panels on frame as shown and flush with installed panel Secure panel using 2 nails 6 apart along seam and 12 apart inside panel You have finished building your back wall FINISH 4 To draw panels tight at seams angle nail 3 4 GAUGE BLOCK GAA NOTE Wall shown is a generic image 1 1 2 3 8 cm ...

Page 36: ...4 cm TO Place 1 TO and 1 CHC end to end Center OSB on top of TO and CHC Nail using 3 nails in the pattern shown Place another TO and CHC on top of OSB staggering the seams from the first TO and CHC 2 3 1 BEGIN You have assembled your door header FINISH 1 OSB ASSEMBLED END VIEW DOOR CHC CHC TO TO Flip header assembly over and nail as shown on the other side Flush Flush Flush ...

Page 37: ...e stud using 2 3 screws Fig A Attach 2nd end UY to 1st UY using 2 3 nails Fig A Attach middle UY x6 to Pre Assembled Header using 2 3 screws at each connection Fig B 2 3 1 BEGIN x2 2 x 4 x 68 1 2 5 1 x 10 2 x 174 cm YFA x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 2 x 4 x 23 7 16 5 1 x 10 2 x 59 5 cm x2 JYA 2 x 4 x 6 1 2 5 1 x 10 2 x 16 5 cm x10 UY x1 Pre Assembled Header Pre Assembled Header 3 7 6 ...

Page 38: ...parts on edge as shown Secure using 3 nails as shown 4 HINT You have finished your front wall frame FINISH x1 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x1 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP x2 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI 3 7 6 cm Nails SP TP AI AI 11 3 4 29 8 cm 11 3 4 29 8 cm Flush Flush ...

Page 39: ...LL PANELS x23 6 15 2 cm Primed side UP 3 4 GAUGE BLOCK GAA Place one header panel onto wall frame as shown Use the guage block GAA to mark the 3 4 measurement on the wall stud Locate the panel 1 1 2 above the top plate 2 Secure panels to frame using 2 2 nails 6 apart 1 BEGIN 1 x1 3 8 x 11 1 4 x 48 1 x 28 6 x 121 9 cm 1 1 2 3 8 cm ...

Page 40: ...UP Flush 4 1 3 Place the second header panel onto wall frame as shown Locate the panel 1 1 2 above the top plate Secure panels to frame using 2 nails 6 apart 3 4 GAUGE BLOCK GAA x1 3 8 x 11 1 4 x 48 1 x 28 6 x 121 9 cm To draw panels tight at seams angle nail 1 1 2 3 8 cm ...

Page 41: ... braces using 3 screws into wall framing as shown Place 23 7 8 x 84 panels 1 1 2 above frame flush to installed panels 5 6 x2 FINISH You have finished assembling your front wall x86 6 15 2 cm 12 30 5 cm 3 8 x 23 7 8 x 84 1 x 60 7 x 213 4 cm 3 8 x 23 7 8 x 84 1 x 60 7 x 213 4 cm 2 x 4 x 96 5 1 x 10 2 x 243 8 cm Temporary Support LEFT RIGHT Offset TP 3 7 6 cm x4 3 Screw 3 Screw 3 Screws Flush Flush ...

Page 42: ... cm BEGIN Secure the bottom plate using 2 3 nails between wall studs Fig C 3 4 Nail along bottom of side wall panels using 2 nails 6 apart Fig A Angle nail to hit floor frame Fig B Fig B Center side wall A on floor 1 3 7 6 cm Nails PARTS REQUIRED x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 5 1 cm Nail Fig A Fig C D O O R ENSURE 1 1 2 MEASUREMENT IS AT TOP 288 731 5 cm CENTER ON FLOOR TP 6 15 2 cm Tem...

Page 43: ...late Fig A 3 Nail side wall panel to back wall stud using 1 1 2 nails 6 apart Fig B Nail along bottom of back wall panels using 2 nails 6 apart Angle nail to hit floor frame Fig C 6 15 2 cm Same Measurement Fig A 2 5 1 cm Screw Center back wall on floor 1 3 7 6 cm Nails PARTS REQUIRED Flush Fig C 2 5 1 cm Nail Fig D Fig B D O O R BACK WALL 2 x13 1 1 2 3 8 cm Nails 2 5 1 cm Screw BE SURE TOP OF WAL...

Page 44: ... stud using 1 1 2 nails 6 apart Fig B Nail along bottom of side wall panels using 2 nails 6 apart Angle nail to hit floor frame Fig C 6 15 2 cm Fig C Same Measurement Fig A 2 5 1 cm Screw Center side wall B on floor 1 3 7 6 cm Nails PARTS REQUIRED x1 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP 2 5 1 cm Screw 1 1 2 3 8 cm Nails Flush 2 5 1 cm Nail Fig B Fig D DOOR FINISH 1 1 2 3 8 cm x13 BE SURE TOP OF WAL...

Page 45: ...SURE PANEL CORNERS ARE FLUSH 2 2 5 1 cm Screw 2 5 1 cm Screw 2 5 1 cm Screw Flush Flush Flush Flush Secure top and bottom of wall using 1 2 screw into top and bottom plates Fig A Fig A 2 5 1 cm Screw 43 FRONT WALL INSTALLATION DOOR PARTS REQUIRED 2 5 1 cm x4 BEGIN ...

Page 46: ...t wall panels to side wall studs using 1 1 2 nails 6 apart Fig D Secure front wall to floor using 3 nails Fig E 2 5 1 cm Nails 4 3 1 1 2 3 8 cm Nails Fig D Nail lower edge of panels to floor using 2 nails 6 apart Angle nail to hit floor frame Fig C Fig C Angle nail to hit floor frame Fig E 3 7 6 cm Nails 44 FRONT WALL INSTALLATION FINISH PARTS REQUIRED ...

Page 47: ...le stud Fig C install brace flush under top plate at each end using 1 3 screw Fig A Measure from end of brace inside wall panel 61 154 9 cm and mark a vertical line on brace Fig A and B Locate a TP in approximately the position shown in Fig A and attach at lower end using 1 3 screw With assistance push or pull the wall until TP is flush to the mark and top of brace Fig A B and C Secure TP onto bra...

Page 48: ...paced every 24 Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 3 cm UL x6 2 x 4 x 96 5 1 x 10 2 x 243 8 cm TP PARTS REQUIRED x2 2 x 4 x 44 1 2 5 1 x 10 2 x 113 cm STL DOUBLE DOOR STL STL UL UL TP TP TP TP TP TP 96 243 8 cm 96 243 8 cm 96 243 8 cm 96 243 8 cm 96 243 8 cm 96 243 8 cm 92 5 8 235 cm 92 5 8 235 cm Nail 24 61cm TYP 44 1 2 113 cm 44 1 2 113 cm 3 7 6 cm Nails 1 ...

Page 49: ... 2 to attach second gusset to other side 3 2 5 1 cm Contact at peak Flush FINISH You have finished assembling your rafters RAFTERS 2 5 1 cm PARTS REQUIRED 6 x 24 15 2 x 60 9 cm SET TWO SINGLE GUSSET RAFTER ASSEMBLIES ASIDE These will be used as end rafters Temporary support TP Contact at peak 144 365 8 cm Fit base of rafters in corners of back wall x1 Temporary Support TP 2 x 4 x 96 5 1 x 10 2 x 2...

Page 50: ...1 Gusset Rafters flush to the outside edge of wall panel using 1 3 screw Fig C FINISH You have finished installing your rafters 2 3 x48 3 7 6 cm Rafter with ONE GUSSET facing inward 1 BEGIN 1 Fig B CENTER on marks Rafter with ONE GUSSET facing inward Fig A 24 3 8 62 cm 24 3 8 62 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm Fig C Flush Panel DIMENSION...

Page 51: ... cm 1 1 2 3 8 cm x2 x2 x2 TTA TTA Flush Flush 1 1 2 Nails 3 8 cm 2 Place center gable panel on TTA primed side up as shown Nail panel using 1 1 2 nails Place left and right panels on TTA flush to center gable panel Nail panel using 1 1 2 nails 1 1 2 3 8cm x24 3 Repeat STEPS 1 2 for opposite side gable panel assembly 1 BEGIN 1 1 1 2 Nails 3 8 cm ...

Page 52: ...nside toe nail gable connectors TTA using 3 nails Repeat STEPS 4 5 to install gable panels at opposite side Center gable assembly on back wall Nail using 2 nails 6 apart as shown You have finished installing your gable panels PARTS REQUIRED 2 5 1 cm x96 3 Screws 7 6 cm 2 Nails 5 1 cm 3 7 6 cm x8 ...

Page 53: ...g B 1 BEGIN Place the 47 7 8 x 39 3 4 panel flush to the rafter marks Panel should be at 1 2 from the outside edge of the first rafter Fig C Use the 3 4 gauge block GAA to center panel over the rafter Fig B Secure panel using 2 2 nails in the corners as shown Panel will overhang 6 1 2 Fig D 3 2 Place 1st 96 x 39 3 4 roof panel flush to the rafter marks and flush to the installed panel Use the 3 4 ...

Page 54: ...e a 1 2 from the outside edge of the end rafter Fig E Secure panel using 2 2 nails in the corners as shown Panel will overhang 6 1 2 Fig D 4 5 Place 2nd 96 x 39 3 4 roof panel flush to the rafter marks and flush to the installed panel Use the 3 4 gauge block GAA to center panel over the rafter Fig B Secure panel using 2 2 nails in the corners Panel will overhang 6 1 2 Fig D x1 39 3 4 x 96 101 0 x ...

Page 55: ... nails into each rafter Fig F 24 60 9 cm 24 3 4 57 6 cm 24 3 4 57 6 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm NOTE Measurements from outside of panels Fig F 3 4 1 9 cm Gauge Block Fig B Place 1st upper 48 x 96 panel flush to installed panels Panel should be 3 8 from the outside edge of the first rafter Fig C Use the 3 4 gauge block GAA to...

Page 56: ... and secure using 2 2 nails into each rafter Fig F 24 60 9 cm 24 3 4 57 6 cm 24 3 4 57 6 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm 24 60 9 cm NOTE Measurements from outside of panels Fig F ROOF PANELS Repeat STEP 8 to install 2nd upper 48 x 96 panel Panel should be 3 8 from the outside edge of the end rafter Fig E FINISH 3 4 1 9 cm Gauge Block Fig B...

Page 57: ...2 x 88 1 2 1 5 x 10 2 x 224 8 cm x1 YRR x24 2 5 1 cm YRR YRL You have finished installing your back gable trim Install back gable trim YRL and YRR flush to top of roof panel and flush at peak using 2 finish nails as shown Fig A Fig B BEGIN 1 FINISH Flush Flush to top of panel Fig B Fig A SPACED EVENLY SPACED EVENLY Roof Panel ...

Page 58: ...ig B Flush Flush Flush ULL ULR RIGHT OVERHANG LEFT OVERHANG TQA ANGLED END Flush 56 Left overhang shown PARTS REQUIRED FRONT GABLE OVERHANG 2 x 4 x 88 1 8 5 1 x 10 2 x 223 8 cm x2 TQA x12 2 5 1 cm Angled End ANGLED END Primed side DOWN Primed side DOWN Primed side DOWN 19 32 x 3 1 2 x 88 1 8 1 5 x 10 2 x 223 8 cm x1 ULL 19 32 x 3 1 2 x 88 1 8 1 5 x 10 2 x 223 8 cm x1 ULR Repeat STEP 1 using ULR to...

Page 59: ...ve installed your front gable overhang trim TQA INSIDE VIEW Install front left and right overhang assemblies flush to top of roof panel using 5 2 finish nails and flush at peak Fig A Fig B 2 BEGIN 1 Working from inside screw through roof rafter into gable overhang 2 x 4 TQA Use 5 3 screws spaced apart evenly as shown Fig A Flush 2 5 1 cm Finish Nails ULL Fig B ...

Page 60: ... same as first ROS with ends flush to the installed soffit boards FINISH BEGIN You have finished installing your soffits Repeat STEPS 1 2 on opposite side 1 x5 ROS 2 3 Space screws evenly ROS x5 Flush Fig A x10 4 4 x 5 1 2 x 57 15 16 2 5 x 14 0 x 147 2 cm ROS x80 1 2 5 cm 1 Screws 3 2 cm Tight against wall BEGIN HERE Align end of ROS with inner edge of gable trim ...

Page 61: ...overhang using 2 finish nails Fig A Install two additional 83 1 2 and one 43 1 8 fascia boards as shown Repeat STEPS 1 2 to install fascia boards on opposite side FINISH BEGIN You have finished installing your eave fascia boards 1 2 3 Fig A Flush 2 5 1 cm Finish Nails Soffit Board 2 5 1 cm Finish Nails 2 5 1 cm Finish Nail into end of 2x4 gable trim BEGIN HERE 83 1 2 83 1 2 83 1 2 43 1 8 Flush to ...

Page 62: ...REQUIRED BACK GABLE TRIM ENDS 3 7 6 cm x4 You have finished securing your gable trim ends Fasten back gable trim ends to ROS using 1 3 screw on both sides Fig A BEGIN 1 FINISH Fig A 3 7 6 cm Screw Gable trim ROS ...

Page 63: ... x 224 8 cm x2 YRL 19 32 x 3 1 2 x 88 1 2 1 5 x 10 2 x 224 8 cm x2 YRR YRR YRL You have finished installing your front gable trim Install YRL and YRR flush to the top of the gable Fig A Use 2 finish nails spaced evenly as shown Fig B BEGIN 1 FINISH Flush Flush Flush SPACED EVENLY SPACED EVENLY Fig B Fig A ...

Page 64: ...gable panel corner notch and flush along side wall panel edge Fig A Fig B Secure using 2 finish nails evenly spaced Fig B Fig C FINISH BEGIN Fit 2nd 83 1 2 corner trim flush to top of installed front corner trim and along edge Fig A Fig B Secure using 2 finish nails evenly spaced Fig B Fig C Repeat STEPS 1 2 for other corners 1 2 3 Fig C Fig A Flush Fig B Flush Flush ...

Page 65: ...side inside of door using 3 4 screws On outside of double door measue and mark location of 2nd NSA as shown Secure NSA from back side inside of door using 3 4 screws BEGIN 1 DOUBLE DOORS PARTS REQUIRED x2 Double Door 2 3 FTA NSA NSA FTA 3 4 1 9 cm x36 Flush Flush FTA to the upper door trim Flush FTA to edge Flush 3 4 1 9 cm Screws NSA x4 19 32 x 3 1 2 x 41 1 5 x 8 9 x 104 1 cm 19 32 x 3 1 2 x 8 3 ...

Page 66: ...oor trim from back using 3 4 screws at locations shown 3 4 1 9 cm x40 4 Place window in window opening on inside of door Seal window using high quality exterior caulk before installing Secure window using 3 4 screws You must caulk completely around window frame to validate your warranty Use a paintable exterior rated caulk ...

Page 67: ...l and at 3 4 mark Secure OO using 5 2 screws Place 2 parts SPA at measurements square and flush to installed OO Secure each SPA using 2 screws Place next OO indexed 1 1 2 down from top of panel square and flush to installed parts SPA Secure OO using 2 screws 8 9 7 OO OO OO OO SPA SPA SPA SPA For squareness maintain 7 8 measurement along panel edge BEGIN HERE 1 1 2 3 8 cm 7 8 2 2 cm 7 8 2 2 cm Flus...

Page 68: ...tall hinges on your RIGHT double door Note Hinges will go on the right side of the RIGHT door PARTS REQUIRED DOUBLE DOOR HINGES Secure hinges using 2 lag screws with washers Fig B 2 x12 2 5 1 cm Locate hinges on front side of LEFT double door as shown Center hinges on door trim and flush hinge at edge of trim Pre drill lag screw location using a 1 8 drill bit Fig A BEGIN 1 Washer x12 5 16 0 8 cm C...

Page 69: ...183 8 cm Measure up 72 3 8 from the bottom of panel on both sides and mark FINISH You have finished installing your hinge boards Install ZP at the 72 3 8 mark and flush to panel Fig A door opening using 2 finish nails as shown Fig B C 2 2 Finish Nails Fig B Fig C Level Flush Fig A ZP ZP ZP 72 3 8 183 8 cm ...

Page 70: ... 2 cm x2 XSA Pre Assembled Double Doors Temporary Support x8 2 5 1 cm Set double doors facing up Separate doors 3 8 apart and flush at top Place XSA across top and bottom of doors and fasten using 2 screws 2 3 8 1 0 cm 3 8 1 0 cm 3 8 1 0 cm Flush XSA XSA 2 5 1 cm Screws ...

Page 71: ...rt TP as a ledger board 1 below top of floor decking using 3 wood screws Fig A Center doors in door opening Fig B Pre drill holes for lag screws using a 1 8 drill bit Remove temporary supports and check that doors open properly FINISH You have finished installing your double doors Screw hinges into wall supports using 3 lag screws with washers as shown 3 7 61 cm Lag Screws Top View Fig B 3 76 mm W...

Page 72: ...d and working from inside place 1 5 8 x 69 weatherstrip flush to top Fig A and edge Fig B of OO 1 PARTS REQUIRED DOUBLE DOOR WEATHERSTRIP 3 8 x 1 5 8 x 69 1 x 4 1 x 175 3 cm x1 x5 1 2 5 cm Weatherstrip O O Flush weatherstrip to edge of OO Fig B Secure weatherstrip using 1 screws into door panel Fig B 2 Fig A 14 35 5 cm Approximately ...

Page 73: ...1 x20 2 5 1 cm PARTS REQUIRED DOUBLE DOOR WEATHERSTRIP 1 x 3 x 69 3 4 2 5 x 7 6 x 177 2 cm x2 XSA You have finished installing your weatherstripping FINISH Install two XSA weatherstrips using 2 finish nails as shown Fig A 3 Fig A TOP VIEW Wall Frame Door Flush XSA ...

Page 74: ...46 1 2 x 48 0 5 x 118 1 x 121 9 cm Pegboard Door Backer Board x36 1 1 4 3 2 cm You have finished installing your door reinforcements FINISH Place 46 1 2 x 48 backer board flush to door frame Fig A Fig B Secure backer board using 1 1 4 screws into door frame as shown 2 Repeat STEP 1 to install backer board on other door frame Fig A Fig B 48 121 9 cm ...

Page 75: ...GIN 1 Measure and mark locations of door handles as shown Pre drill for lag screws using an 1 8 drill bit Fasten handles using screws provided Fig A 2 35 3 4 90 8 cm 1 3 4 4 4 cm 1 3 4 4 4 cm Handles come packed with lag screws or hex bolts Customer can use either option ...

Page 76: ...both locations for door latch parts as shown Pre drill holes for screws using an 1 8 drill bit Install door latch and strike plate as shown Strike plate is flush to the outside edge of door Fig A 2 39 1 2 100 3 cm Center Flush Center Fig A You have finished installing your decorative door latch FINISH ...

Page 77: ... screws supplied and drill 5 16 0 8 cm hole deep enough for bolt to slide into LEFT DOOR 5 16 0 8 cm Drill Bit PARTS REQUIRED HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling 1 2 5 cm x2 x8 Fig A Fig B OO OO FLOOR PRE DRILL 4 HOLES PRE DRILL 4 HOLES 3 8 1 cm 1 2 1 3 cm 1 1 4 x 2 1 2 x 69 5 16 0 8 cm drill for bolt 1 2 5 cm deep 5 16 0 8 cm drill for bolt 1...

Page 78: ...h to gable overhang trim Fig B Repeat STEP 2 to install ERL and ERR to opposite side of shed 2 3 BEGIN 1 FINISH GABLE DOUBLE DOOR FRONT TRIM 19 32 x 3 1 2 x 53 5 1 x 10 2 x 134 6 cm x2 HAB 19 32 x 3 1 2 x 69 15 16 5 1 x 8 9 x 177 6 cm x2 ERR x2 ERL 19 32 x 3 1 2 x 69 15 16 5 1 x 8 9 x 177 6 cm Fig A Fig B ERL ERR HAB HAB 2 5 1 cm Finish Nails 2 5 1 cm Finish Nails LEVEL LEVEL CENTER CENTER Flush 8...

Page 79: ...after 11th Rafter Locate collar tie TP on back of 3rd rafter from the door wall as shown Secure collar tie to rafter using 3 3 nails at each end Repeat STEPS 1 2 to attach collar ties to the 5th 7th 9th and 11th RAFTERS from the door Check collar tie is level and flush to roof panel 1 FINISH You have finished installing your collar ties 2 3 x30 LEVEL Flush Flush 3 7 6 cm x5 TP 2 x 4 x 96 5 1 x 10 ...

Page 80: ...STOP UNIVERSAL DOOR SWINGS OPEN TO THE RIGHT UNIVERSAL DOOR SWINGS OPEN TO THE LEFT 78 CHOOSE YOUR UNIVERSAL DOOR OPENING DIRECTION Right Hand or Left Hand LEFT HAND DOOR RIGHT HAND DOOR ...

Page 81: ... and floor frame Measure Gap Fig B between door trim and wall panel as shown Hold door in position and keep level Hinge board must overhang wall panel at measurement shown Fig C Bottom of door trim is even with wall panel as shown Angle 3 7 6 cm Screw Fig E Fig D Fig C 3 8 1 0 cm 3 8 1 0 cm Door trim even with panel Door Frame Flush Carefully cut bottom wall frame 2 x 4 flush with door frame using...

Page 82: ...Fig A Locate screws as shown in Fig B Flush ZJ with bottom of wall panel and door and secure using 5 2 finish nails into framing as shown Ensure 3 8 measurement as shown Fig C x9 2 5 1 cm 3 8 1 0 cm CENTER CENTER Flush 4 Center trim GEA over door and secure using 4 2 finish nails into framing as shown Fig C 11 1 2 29 2 cm 11 1 2 29 2 cm AH AH AH Fig B INSIDE OF DOOR 80 SINGLE DOOR TRIM PARTS REQUI...

Page 83: ...SA INSIDE OF DOOR OO 81 BEGIN Center OO vertically on door in the door opening Fig A 1 from edge of door Fig B 1 PARTS REQUIRED x6 2 5 1 cm SINGLE DOOR STIFFENER WEATHER STRIP You have finished installing your weatherstrip FINISH Secure using 6 2 screws through outside trim into OO Fig B Fig A Center OO in door opening 2 Install two weatherstrips XSA flush to the bottom and front of door Fig C Sec...

Page 84: ...edge of door stiffener You have finished installing your T handle BEGIN 1 FINISH 4 2 3 Insert handle in hole and secure using 1 1 2 3 8 cm screws Fig B Attach inside handle and secure with set screw as shown x1 x2 1 1 2 3 8 cm TOP VIEW 1 3 4 3 8 cm 82 SINGLE DOOR HARDWARE PARTS REQUIRED 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 1 3 4 4 4 cm Fig A Fig B 1 1 2 3 8 cm x2 5 1 2 Shaft Set Screw 35 3 4 90 ...

Page 85: ... Ensure window is level x3 PARTS REQUIRED Seal window using high quality exterior grade caulk before installing Fig A 2 WINDOWS AND WINDOW TRIM Repeat Steps 1 2 to install other windows 1 5 8 4 1 cm x12 Caulk behind frame near edge Fig A 1 5 8 4 1 cm Screws ...

Page 86: ...tall trim for second and third windows WINDOW TRIM Place trim pieces ROR and AZ centered on window frame Fig A Attach using 2 finish nails Nail into window frame and studs behind Fig A 2 Finish Nails into wall frame CENTER OF WINDOW CENTER OF WINDOW CENTER OF WINDOW ROR ROR AZ AZ 23 1 8 58 7 cm 30 1 8 76 5 cm You must caulk completely around window frame to validate your warranty Use a paintable e...

Page 87: ...RED GABLE VENTS BEGIN Position VENTS in front and back gables as shown and secure using 1 screws Seal vent using high quality paintable exterior caulk 1 Your gable vents are now installed FINISH 2 x2 Vent x8 1 2 5 cm ...

Page 88: ... hook 2 up from bottom of panel edge into solid 2x4 framing BEGIN 1 FINISH Swing door open to locate eye and install as shown Install hooks 2 up from bottom edge of panel Fig A You have finished installing your hook and eye 2 Hook Eye 2 Fig A 86 ...

Page 89: ... Follow directions provided by manufacturer Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer PAINT CAULK NOT INCLUDED ROOF FELT NOT INCLUDED DRIP EDGE NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP Flush Flush Install drip edge over roof...

Page 90: ...cross with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BEGIN 1 TABS UP Shingle overlaps roof decking 1 2 5 cm overhang past roof deck 1 2 5 cm overhang or flush with drip edge 4 Nails BACK OF SHED FRONT OF SHED NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Familiarize yourself with a 3 Tab Shingle SHINGLE NAIL PATTERN 1 2 5 cm NAILS Sealing...

Page 91: ...Roof Deck 1 2 5 cm Flush with starter row Flush with starter row Continue installing rows of shingles by staggering at front 4 Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row 3 Bend in roof 1 2 5 cm 1 2 5 cm BACK OF SHED FRONT OF SHED FRONT OF SHED Flush with rain slots Flush with rain slots Notch Notch ...

Page 92: ...5 to rain slot you must install another row of shingles 5 12 7 cm or less 5 12 7 cm MAX Top of rain slot Cut Off You have finished shingling your roof Proceed to capping the ridge FINISH 9 Repeat steps 1 7 to shingle the opposite side of your roof Trim shingles at ridge Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut ...

Page 93: ...first Score shingle then snap off angled cut Install first ridge cap flush to shingles at front as shown Install second ridge cap 5 back as shown 2 3 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm Top of slot Weather Seal Flush 1 Nail per side through weather seal 1 Nail per side through weather seal 5 12 7 cm FRONT OF SHED Flush 48 to 52 Pieces ...

Page 94: ...tween the shingle color and edge of shingles When you have 4 minimum of shingle color cut one piece to cap your roof Install flush to shingles 4 5 6 7 2 Nails per side You have finished your ridge cap FINISH 8 Cut at top of rain slot Flush to shingles Trim cap off flush to shingles Cap 4 10 2 cm BEGIN ...

Page 95: ... This page intentionally left blank ...

Page 96: ... This page intentionally left blank ...

Page 97: ... siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative an exterior oil based semi transparent st...

Reviews: