FINISH
You have finished building your front gable
overhang assemblies.
2"
(75,1 cm)
Screws
ULL
TQA
Place
ULL
on top of
TQA
. Ensure parts are flush along edge and at angled end.
Secure using 2" screws as shown
(Fig. A, Fig. B)
..
1
BEGIN
Fig. A
Fig. B
Flush
Flush
Flush
ULL
ULR
RIGHT OVERHANG
LEFT OVERHANG
TQA
ANGLED
END
Flush
56
(Left overhang shown)
PARTS REQUIRED:
FRONT GABLE OVERHANG
2 x 4 x 88-1/8" (5,1 x 10,2 x 223,8 cm)
x2
TQA
x12
2" (5,1 cm)
Angled End
ANGLED
END
Primed
side DOWN
Primed
side DOWN
Primed
side DOWN
19/32" x 3-1/2" x 88-1/8" (1,5 x 10,2 x 223,8 cm)
x1
ULL
19/32" x 3-1/2" x 88-1/8" (1,5 x 10,2 x 223,8 cm)
x1
ULR
Repeat STEP 1 using
ULR
to build right overhang assembly.
2