76
PARTS REQUIRED:
x44
2" (5,1 cm)
You have finished installing your over door and gable trim.
Install two
HAB
over door trim using 2" finish nails level and flush to top door hinge board
(Fig. A)
.
Install left and right gable trim
ERL
and
ERR
using 2" finish nails
,
level and flush to gable overhang trim
(Fig. B)
.
Repeat STEP 2 to install
ERL
and
ERR
to opposite side of shed.
2
3
BEGIN
1
FINISH
GABLE & DOUBLE DOOR FRONT TRIM
19/32" x 3-1/2" x 53" (5,1 x 10,2 x 134,6 cm)
x2
HAB
19/32" x 3-1/2" x 69-15/16" (5,1 x 8,9 x 177,6 cm)
x2
ERR
x2
ERL
19/32" x 3-1/2" x 69-15/16" (5,1 x 8,9 x 177,6 cm)
Fig. A
Fig. B
ERL
ERR
HAB
HAB
2" (5,1 cm)
Finish Nails
2" (5,1 cm)
Finish Nails
LEVEL
LEVEL
CENTER
CENTER
Flush
8"
(20,3 cm)
Approximately
8"
(20,3 cm)
Approximately
Flush
Flush
Flush
Flush