61
PARTS REQUIRED:
FRONT GABLE FASCIA
2" Finish Nails
(5,1 cm)
x12
2" (5,1 cm)
19/32" x 3-1/2" x 88-1/2" (1,5 x 10,2 x 224,8 cm)
x2
YRL
19/32" x 3-1/2" x 88-1/2" (1,5 x 10,2 x 224,8 cm)
x2
YRR
YRR
YRL
You have finished installing your front gable trim.
Install
YRL
and
YRR
flush to the top of the gable
(Fig. A)
.
Use 2" finish nails spaced evenly as shown
(Fig. B)
.
BEGIN
1
FINISH
Flush
Flush
Flush
SPACED EVENL
Y
SPACED EVENL
Y
Fig. B
Fig. A