3"
(7,6 cm)
Screws
1-1/2"
(3,8 cm)
57
PARTS REQUIRED:
FRONT GABLE OVERHANG
x1
Left Overhang Assembly
x1
2" (5,1 cm)
x10
Right Overhang Assembly
3" (7,6 cm)
x10
FINISH
You have installed your front gable overhang trim.
TQA
INSIDE VIEW
Install front left and right overhang assemblies flush to top of roof panel using (5) 2" finish
nails and flush at peak
(Fig. A, Fig. B)
.
2
BEGIN
1
Working from inside, screw through roof rafter into gable overhang 2 x 4
TQA
.
Use (5) 3" screws spaced apart evenly as shown.
Fig. A
Flush
2" (5,1 cm)
Finish Nails
ULL
Fig. B