RT70 Operator’s Manual
Transport - 91
Haul
Load
1. Fasten and adjust seat belt with seat facing forward.
2. Start engine.
3. Release parking brake.
4. Select low ground drive speed.
5. Raise attachments, but keep them low and centered. Ensure they are not in float.
6. Slow engine to low throttle and slowly drive tractor to rear of trailer and align with ramps.
7. Drive forward slowly to move machine onto trailer until tiedown position is reached.
8. Lower attachments to trailer bed.
9. Set parking brake.
10. Ensure all controls are in neutral position.
11. Shut off machine.
12. Tie down machine.
Horizontal movement. Crushing can cause death or
serious injury. Read and understand operator’s manual and all safety
instructions before use.
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...