Plow - 118
RT70 Operator’s Manual
Finish Job
Finish Job
1. When installation is complete, move plow swing and plow lift out of float.
2. Stop machine movement.
3. With vibrator running, raise plow to ground level while reducing vibrator speed.
4. Stop vibration.
5. Return seat to the drive position.
6. Set parking brake.
7. Lower backfill blade, if equipped.
8. Shut off machine.
9. Remove product from plow.
10. Fasten and adjust seat belt.
11. Start machine.
12. Swing plow to center position and engage stow lock.
13. Release parking brake.
14. Raise backfill blade, if equipped.
15. Disengage axle lock. After disengaging axle lock, drive tractor in reverse 6’ (2m) to fully disengage.
16. Drive a short distance away from work site.
17. Shut off machine.
NOTICE:
Do not operate vibrator when plow is out of the ground.
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...