Maintenance - 184
RT70 Operator’s Manual
Trencher Procedures
Trencher Procedures
Attachment Mounting Bolts
Check bolts (shown) every 10 hours.
1. Check for looseness or wear.
2. Apply Loctite 271.
3. Tighten inner bolts (2) to 230ft•lb (312N•m).
4. Tighten outer bolts (1) to 449ft•lb (608N•m).
Auger Bearings
Lube two bearing zerks (one on each side, shown)
with EPG every 10 hours.
Auger Bolts
Check bolts every 10 hours. For optimal spoils
delivery, adjust augers (shown) to match terrain
and digging depth.
1
1
22
t63om063h21.eps
t63om063h21.eps
t63om064h21.eps
t63om064h21.eps
t63om065h21.eps
t63om065h21.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...