Maintenance - 192
RT70 Operator’s Manual
Trencher Procedures
Pivot
Wipe four zerks (shown) located on right side of
trencher pivot clean and lube with EPG every 10
hours.
Wipe four zerks (shown) located on left side of
trencher pivot clean and lube with EPG every 10
hours.
Restraint Bar Position
Check every 10 hours or anytime the digging
chain is adjusted or replaced.
1. Ensure end of bar extends between the
center of the tail roller/sprocket and the end
of the digging chain.
2. Check for looseness or wear.
t63om071h21.eps
t63om071h21.eps
t63om091h21.eps
t63om091h21.eps
t63om072h21.eps
t63om072h21.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...