
Specifications - 204
RT70 Operator’s Manual
RT70 Tractor
Specifications are called out according to SAE recommended practices. Specifications are general and subject to change without
notice. If exact measurements are required, equipment should be weighed and measured. Due to selected options, delivered
equipment may not match that shown.
Battery, 2 used
Group 78U, SAE res. cap 115min., SAE cold crank @ 0°F (-18°C), 800amp, dual battery option
Auxiliary power outlet - 12volt, 10amp
Vibration Levels
Plowing
Trenching
Average vibration transmitted to the operator’s hand during
normal operation
13.1m/sec²
4.2m/sec²
Average vibration transmitted to the operator’s whole body
during normal operation
0.6m/sec²
0.9m/sec²
Operator seat per ISO 7096
Actual vibration levels depend on the conditions of the operation being performed.
Noise Level
Operator 91 dbA sound pressure per ISO 6394
Exterior 107 dbA sound power per ISO 6393.
This machine can generate sound levels exceeding 80dBA. Always wear appropriate hearing protection
when operating machine. Find sound power and pressure information at www.ditchwitch.com, or
contact [email protected].
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...