RT70 Operator’s Manual
Backhoe - 99
Operate
Prepare Backhoe
1. Rotate seat out of stowed position.
2. Release swing lock.
3. Release stow lock.
Operate
1. Start engine.
2. Move to backhoe seat.
3. Lower backfill blade, if equipped.
4. Adjust throttle to desired speed.
5. Dig hole or trench.
• Keep dipper and boom at right angles as
much as possible for maximum power.
• Keep bucket in line with dipper as much
as possible.
• Position bucket so teeth cut soil. As soil is
cut, curl bucket under dipper.
• Move dipper and bucket together.
Increasing engine speed will not increase
backhoe force.
2
2
11
t63om026h21.eps
t63om026h21.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...