Maintenance - 178
RT70 Operator’s Manual
Plow Procedures
Connector Pivots
Check every 10 hours. Test upper and lower arm
joints every 100 hours.
Check
Check pivots (shown) for wear or damage.
Test
Upper Arm Joints:
1. Lower plow to ground.
2. Use plow lift control to put hydraulic load on
pivot joints. Do not raise plow.
3. As hydraulic load is applied and released,
check joints for motion at joints (1). If motion
is observed, contact your Ditch Witch dealer.
Lower Arm Joints:
1. Lower plow to ground.
2. Use hydraulic jack to place load on lower arm.
3. As hydraulic load is applied and released, check joints (2) for motion. If motion is observed, contact
your Ditch Witch dealer.
t63om053h21.eps
t63om053h21.eps
1
1
22
t63om054h21.eps
t63om054h21.eps
Summary of Contents for RT70
Page 9: ...Overview 8 RT70 Operator s Manual About This Manual ...
Page 19: ...Safety 18 RT70 Operator s Manual Emergency Procedures ...
Page 31: ...Safety 30 RT70 Operator s Manual Attachment Safety Alerts ...
Page 83: ...Controls 82 RT70 Operator s Manual Seat ...
Page 89: ...Drive 88 RT70 Operator s Manual Shut Down ...
Page 97: ...Transport 96 RT70 Operator s Manual Haul ...
Page 103: ...Backhoe 102 RT70 Operator s Manual Finish Job ...
Page 123: ...Reel Carrier 122 RT70 Operator s Manual Finish Job ...
Page 129: ...Trench 128 RT70 Operator s Manual Finish Job ...
Page 141: ...Systems and Equipment 140 RT70 Operator s Manual Counterweights ...
Page 221: ...Specifications 220 RT70 Operator s Manual EU Declaration of Conformity ...