3 - 30
CHK
ADJ
CHECKING THE CRANKCASE BREATHER HOSE/
CHECKING THE EXHAUST SYSTEM
3. Install:
• fuel tank
Refer to “FUEL TANK AND AIR FIL-
TER”.
EB303200
CHECKING THE EXHAUST SYSTEM
The following procedure applies to all of
the exhaust pipes and gaskets.
1. Remove:
• radiator assembly
Refer to “RADIATOR AND THERMO-
STAT” in chapter 5.
2. Check:
• exhaust pipe joint
1
• exhaust pipe
2
• muffler
3
Cracks/damage
→
Replace.
• gasket
4
Exhaust gas leaks
→
Replace.
3. Measure:
• tightening torque
4. Install:
• radiator assembly
Refer to “RADIATOR AND THERMO-
STAT” in chapter 5.
T
R
.
.
Exhaust pipe joint bolt
5
20 Nm (2.0 m • kg, 14 ft • lb)
Muffler clamp bolt
6
20 Nm (2.0 m • kg, 14 ft • lb)
Exhaust pipe bolt
7
20 Nm (2.0 m • kg, 14 ft • lb)
Muffler bolt
8
38 Nm (3.8 m • kg, 27 ft • lb)
1
6
3
7
4
5
2
8
Summary of Contents for YZF-R7
Page 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Page 8: ......
Page 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Page 72: ...3 3 CHK ADJ ...
Page 363: ...8 27 ELEC ...
Page 380: ......