4 - 38
ENG
PICKUP COIL
2. Tighten:
• pickup coil rotor bolt
1
NOTE:
While holding the generator rotor
2
with the rotor holding tool
3
, tighten
the pickup coil rotor bolt.
Rotor holding tool
90890-01235
1
1
T
R
.
.
45 Nm (4.5 m · kg, 32 ft · lb)
3. Apply:
• sealant
(onto the pickup coil lead grommet)
Yamaha bond No. 1215
90890-85505
4. Install:
• pickup coil rotor cover
• pickup coil lead holder
• clutch cable holder
NOTE:
• When installing the pickup coil rotor
cover, align the timing chain guide
(intake side) pin
1
of the with the hole
2
in the pickup coil rotor cover.
• Tighten the pickup coil rotor cover
bolts in stages and in a crisscross pat-
tern.
2
2
1
1
Summary of Contents for YZF-R7
Page 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Page 8: ......
Page 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Page 72: ...3 3 CHK ADJ ...
Page 363: ...8 27 ELEC ...
Page 380: ......