ENG
4 - 4
ENGINE
Order
Job/Part
Q’ty
Remarks
Disconnecting the leads and hoses
Disconnect the parts in the order listed.
Fuel tank and air filter case cover
Refer to “FUEL TANK AND AIR FILTER
COVER” in chapter 3.
Air filter case and throttle body
assembly
Refer to “ELECTRONIC FUEL INJEC-
TION” in chapter 6.
Engine oil and oil filter cartridge
Drain.
Refer to “CHANGING THE ENGINE
OIL” in chapter 3.
Oil cooler and thermostat assembly
Refer to “OIL COOLER” and “THER-
MOSTAT ASSEMBLY” in chapter 5.
1
Battery negative lead
1
2
Battery positive lead
1
ACHTUNG:
CAUTION:
First, disconnect the negative lead,
then the positive lead.
Summary of Contents for YZF-R7
Page 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Page 8: ......
Page 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Page 72: ...3 3 CHK ADJ ...
Page 363: ...8 27 ELEC ...
Page 380: ......