3 - 15
CHK
ADJ
SYNCHRONIZING THE THROTTLE BODIES
4. Install:
• vacuum gauge attachments
(into the bolt holes)
• vacuum gauge
(onto the vacuum gauge attachments)
• engine tachometer
(onto the ignition coil of cylinder #1)
NOTE:
Disconnect the ignition coil coupler and
remove the ignition coil
1
of cylinder
#1, remove the rubber cover
2
, and
wrap the engine tachometer lead sev-
eral times around section
a
of the igni-
tion coil. Then, install the ignition coil
and connect the ignition coil coupler.
5. Install:
• fuel tank
Refer to “FUEL TANK AND AIR FIL-
TER”.
6. Start the engine and let it warm up for
several minutes.
Vacuum gauge
90890-03094
Vacuum gauge attachment
90890-03060
Engine tachometer
90890-06760
1
1
2
2
a
a
7. Measure:
• engine idling speed
Out of specification
→
Adjust.
Refer to “ADJUSTING THE ENGINE
IDLING SPEED”.
Engine idling speed
1,000 ~ 1,200 r/min
8. Adjust:
• throttle body synchronization
▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼ ▼
a. Turn the air screws
1
to adjust the
vacuum pressure of all throttle bodies
to specification.
NOTE:
Do not turn the synchronizing screws.
1
1
1
1
Summary of Contents for YZF-R7
Page 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Page 8: ......
Page 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Page 72: ...3 3 CHK ADJ ...
Page 363: ...8 27 ELEC ...
Page 380: ......