7 - 70
CHAS
2. Install:
• right handlebar switch
1
NOTE:
Align the projection
a
on the right han-
dlebar switch with the hole
b
in the
right handlebar.
1
1
a
a
b
b
3. Install:
• throttle grip
1
• throttle cable housing
2
• throttle cables
NOTE:
Align the projection
a
on the throttle
cable housing with the hole
b
in the
right handlebar.
a
a
b
b
1
1
2
2
4. Install:
• clutch master cylinder holder
1
ACHTUNG:
CAUTION:
• Install the clutch master cylinder
holder with the “UP” mark facing up.
• First tighten the upper bolt, then the
lower bolt.
NOTE:
Align the slit in the clutch master cylin-
der holder with the punch mark
a
in the
left handlebar.
UP
UP
UP
1
1
a
a
5. Install:
• left handlebar switch
1
NOTE:
Align the projection
a
on the left han-
dlebar switch with the hole
b
in the left
handlebar.
1
1
a
a
b
b
HANDLEBARS
Summary of Contents for YZF-R7
Page 1: ...5FL 28199 E0 YZF R7 OWNER S SERVICE MANUAL ...
Page 8: ......
Page 58: ...2 20 SPEC Crankcase tightening sequence TIGHTENING TORQUES ...
Page 72: ...3 3 CHK ADJ ...
Page 363: ...8 27 ELEC ...
Page 380: ......