MAINTENANCE INTERVALS
3-1
EASB291069
MAINTENANCE INTERVALS
EASB291070
MAINTENANCE INTERVALS
ECA
NOTICE
• After a break-in or before each race, always check the points shown in “TORQUE-CHECK
POINTS” for tightening torques and retighten them. (“TORQUE-CHECK POINTS” on page 1-
26.)
• Periodic inspection is essential in making full use of the machine performance. The life of
parts varies significantly according to the environment in which the machine runs (e.g., rain,
dirt, etc.). Therefore, earlier inspection is required by reference to the list below.
ITEM
After
break-
in
Every
race
(about
2.5
hours)
Every
third
(about
7.5
hours)
Every
fifth
(about
12.5
hours)
As re-
quired
Remarks
VALVE
Check the valve
clearances
The engine must be cold.
Inspect
Check the valve seats and the
valve faces for wear.
Replace
VALVE SPRING
Inspect
Check the free length and the
tilt.
Replace
VALVE LIFTER
Inspect
Check for scratches and wear.
Replace
CAMSHAFT
Inspect the camshaft surface.
Inspect
Inspect the decompression
system.
Replace
CAMSHAFT
SPROCKET
Inspect
Check for wear on the teeth
and for damage.
Replace
PISTON
Inspect
Inspect crack.
Clean
Inspect carbon deposits and
eliminate them.
Replace
Replace the piston, piston pin,
piston pin clip, and piston ring
all as a set.
Summary of Contents for YZ 2015 Series
Page 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 33: ...CONTROL FUNCTIONS 1 21 a 2...
Page 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 86: ...CABLE ROUTING DIAGRAM 2 43...
Page 88: ...CABLE ROUTING DIAGRAM 2 45...
Page 128: ...ELECTRICAL SYSTEM 3 38...
Page 200: ...CHAIN DRIVE 4 70...
Page 244: ...ELECTRIC STARTER 5 41...
Page 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Page 286: ...TRANSMISSION 5 83...
Page 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Page 321: ...CHARGING SYSTEM 8 15 EASB291338...
Page 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Page 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Page 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Page 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Page 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...