ENGINE
3-19
d. Select an adjusting pad with a proper valve
clearance from the adjusting pad selection
table.
TIP
• There are 25 types of adjusting pads, ranging
from 1.20 mm (0.0472 in) to 2.40 mm (0.0945
in), in increments of 0.05 mm (0.0020 in).
• The field where the number on the originally
installed adjusting pad and the measured
valve clearance intersect shows the adjusting
pad number to replace.
Example:
Pad number = 148
Rounded value = 150
e. Install the new adjusting pads “4” and the
valve lifters “5”.
ECA
NOTICE
Do not twist adjusting pads and valve lifters
forcibly during installation.
TIP
• Apply the engine oil on the valve lifters.
• Apply molybdenum disulfide oil to the valve
stem ends.
• Check that the valve lifters turn smoothly
when rotated with your finger.
• Make sure that valve lifters and adjusting
pads are installed in place.
• Make sure that adjusting pads are installed
with their numbers facing upward.
f. Install the camshafts (exhaust and intake).
Refer to “CAMSHAFT” on page 5-12.
g. Measure the valve clearance again.
h. If the valve clearance is out of specification,
repeat adjusting the valve clearance until it
is within specification.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
Last digit of pad
number
Rounded valve
0, 1 or 2
0
4, 5 or 6
5
8 or 9
10
4
5
Summary of Contents for YZ 2015 Series
Page 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 33: ...CONTROL FUNCTIONS 1 21 a 2...
Page 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 86: ...CABLE ROUTING DIAGRAM 2 43...
Page 88: ...CABLE ROUTING DIAGRAM 2 45...
Page 128: ...ELECTRICAL SYSTEM 3 38...
Page 200: ...CHAIN DRIVE 4 70...
Page 244: ...ELECTRIC STARTER 5 41...
Page 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Page 286: ...TRANSMISSION 5 83...
Page 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Page 321: ...CHARGING SYSTEM 8 15 EASB291338...
Page 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Page 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Page 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Page 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Page 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...