REAR WHEEL
4-9
2. Replace:
• Rear wheel sprocket
▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼▼
a. Remove the self-locking nuts and the rear
wheel sprocket.
b. Clean the rear wheel drive hub with a clean
cloth, especially the surfaces that contact
the sprocket.
c. Install the new rear wheel sprocket.
TIP
Tighten the self-locking nuts in stages and in a
crisscross pattern.
▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲▲
EASB291141
ASSEMBLING THE REAR WHEEL
1. Install:
• Bearing (right side) “1”
• Circlip “2”
• Spacer “3”
• Bearing (left side) “4”
• Oil seals “5”
TIP
• Apply the lithium-soap-based grease to the
bearing and the oil seal lip when installing.
• Install the bearing with seal facing outward.
• Right side of bearing shall be installed first.
• Install the oil seal with its manufacture’s
marks or numbers facing outward.
ECA
NOTICE
Install the bearing by pressing its outer race
parallel.
TIP
Use a socket “1” that matches the diameter of
the bearing outer race and that of the oil seal.
2. Install:
• Brake disc “1”
• Brake disc bolt “2”
TIP
Tighten the bolts in stages and in a crisscross
pattern.
Rear wheel sprocket self-locking
nut
50 Nm (5.0 m·kgf, 36 ft·lbf)
T
R
.
.
New
New
Brake disc bolt
14 Nm (1.4 m·kgf, 10 ft·lbf)
LOCTITE®
5
4
3
1
2
5
LS
LS
1
T
R
.
.
Summary of Contents for YZ 2015 Series
Page 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 33: ...CONTROL FUNCTIONS 1 21 a 2...
Page 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 86: ...CABLE ROUTING DIAGRAM 2 43...
Page 88: ...CABLE ROUTING DIAGRAM 2 45...
Page 128: ...ELECTRICAL SYSTEM 3 38...
Page 200: ...CHAIN DRIVE 4 70...
Page 244: ...ELECTRIC STARTER 5 41...
Page 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Page 286: ...TRANSMISSION 5 83...
Page 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Page 321: ...CHARGING SYSTEM 8 15 EASB291338...
Page 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Page 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Page 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Page 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Page 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...