ENGINE SPECIFICATIONS
2-6
Crankshaft
Crank assembly width
55.95–56.00 mm (2.203–2.205 in)
Runout limit C
0.030 mm (0.0012 in)
Big end side clearance D
0.150–0.450 mm (0.0059–0.0177 in)
Balancer
Balancer drive method
Gear
Clutch
Clutch type
Wet, multiple-disc
Clutch release method
Inner push, cam push
Clutch lever free play
7.0–12.0 mm (0.28–0.47 in)
Friction plate thickness
2.90–3.10 mm (0.114–0.122 in)
Wear limit
2.85 mm (0.112 in)
Plate quantity
9 pcs
Clutch plate thickness
1.10–1.30 mm (0.043–0.051 in)
Plate quantity
8 pcs
Warpage limit
0.10 mm (0.004 in)
Clutch spring free length
47.80 mm (1.88 in)
Limit
46.80 mm (1.84 in)
Spring quantity
5 pcs
Push rod bending limit
0.10 mm (0.004 in)
Transmission
Transmission type
Constant mesh 6-speed
Primary reduction system
Spur gear
Primary reduction ratio
3.353 (57/17)
Final drive
Chain
Secondary reduction ratio
3.923 (51/13)
Operation
Left foot operation
Gear ratio
1st
2.385 (31/13)
2nd
1.813 (29/16)
3rd
1.444 (26/18)
4th
1.143 (24/21)
5th
0.957 (22/23)
6th
0.815 (22/27)
Shifting mechanism
Shift mechanism type
Shift drum and guide bar
Shift fork guide bar bending limit
0.050 mm (0.0020 in)
Shift fork thickness
4.85 mm (0.1909 in)
Decompression device
Device type
Auto decomp
Air filter
Air filter element
Wet element
Air filter oil grade
Foam air-filter oil
C
C
D
A
Summary of Contents for YZ 2015 Series
Page 6: ...EASB291006 YAMAHA MOTOR CORPORATION U S A YZ MOTORCYCLE LIMITED WARRANTY...
Page 10: ......
Page 33: ...CONTROL FUNCTIONS 1 21 a 2...
Page 65: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 22 EASB291066...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 25...
Page 70: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27...
Page 72: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29...
Page 74: ...CABLE ROUTING DIAGRAM 2 31 EASB291068 CABLE ROUTING DIAGRAM...
Page 76: ...CABLE ROUTING DIAGRAM 2 33...
Page 78: ...CABLE ROUTING DIAGRAM 2 35...
Page 80: ...CABLE ROUTING DIAGRAM 2 37...
Page 82: ...CABLE ROUTING DIAGRAM 2 39...
Page 84: ...CABLE ROUTING DIAGRAM 2 41...
Page 86: ...CABLE ROUTING DIAGRAM 2 43...
Page 88: ...CABLE ROUTING DIAGRAM 2 45...
Page 128: ...ELECTRICAL SYSTEM 3 38...
Page 200: ...CHAIN DRIVE 4 70...
Page 244: ...ELECTRIC STARTER 5 41...
Page 266: ...OIL PUMP AND BALANCER GEAR 5 63 c d 6 6 7 8 8 b...
Page 286: ...TRANSMISSION 5 83...
Page 306: ...CHECKING THE INTAKE AIR TEMPERATURE SENSOR 8 67 CHECKING THE FUEL INJECTOR 8 68...
Page 321: ...CHARGING SYSTEM 8 15 EASB291338...
Page 325: ...COOLING SYSTEM For JPN 8 19 EASB291341...
Page 355: ...FUEL PUMP SYSTEM 8 49 EASB291348...
Page 356: ...ELECTRICAL COMPONENTS 8 50 ELECTRICAL COMPONENTS EASB291349 8 9 10 1 3 2 4 5 6 7...
Page 358: ...ELECTRICAL COMPONENTS 8 52 11 10 9 2 3 1 6 7 8 4 5...
Page 360: ...ELECTRICAL COMPONENTS 8 54 EASB291350 CHECKING THE SWITCHES 4 1 3 2 E B S E B E B E E B B...
Page 382: ...LIST OF SELF DIAGNOSTIC AND FAIL SAFE ACTIONS 9 7...