5-9
POWR
Power unit
23. Install the fuse box assy.
O
, and then
tighten the nuts
P
to the specified
torque.
24. Install the band
Q
.
25. Install the plastic ties
R
.
26. Connect the multifunction meter couplers
S
, and then install the plastic ties
T
.
27. Install the service lid.
28. Connect the positive battery cable, and
then connect the negative battery cable.
29. Coat the battery cable terminals and bat-
tery terminals with water resistance
grease.
Electrical box nut
P
:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
O
Q
P
R
T
T
S