5-8
1
2
3
4
5
6
7
8
9
A
15. Connect the fuel hose
A
, and then install
the band
B
.
16. Install the plastic ties
C
.
17. Connect the fuel hose
D
, and then install
the band
E
.
18. Connect the oil hose
F
, and then install
the band
G
.
19. Connect the cooling water hose
H
to
hose joint
I
.
20. Connect the exhaust hose
J
.
21. Connect the cooling water hose
K
, and
then install the band
L
.
22. Connect the cooling water hose
M
, and
then install the band
N
.
Choke cable and throttle cable guide
installation position
c
:
14.0
±
1.0 mm (0.55
±
0.04 in)
Choke cable nut
d
:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
Throttle cable nut
e
:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
0
d
e
9
c
A
C
B
D
E
G
F
I
H
J
L
K
M
N
Summary of Contents for WaveRunner VX 700
Page 1: ...SERVICE MANUAL WaveRunner F2V 28197 ZN 11 VX 700 VX 700 F2V ...
Page 4: ......
Page 16: ...1 11 GEN INFO General information MEMO ...
Page 36: ...2 19 SPEC Specification MEMO ...
Page 104: ...5 35 POWR Power unit MEMO ...
Page 177: ...1 2 3 4 5 6 7 8 9 A Appendix Wiring diagram A 1 ...
Page 179: ......