4-60
CRANKSHAFT
ENG
NOTE:
48 Nm (4.8 m
kg)
CAUTION:
INSTALLATION
1. Apply:
Molybdenum disulfide grease
(onto threads of bolts and nut seats)
Engine oil
(onto crank pins and inner surfaces of connect-
ing rod bearings)
2. Install:
Connecting rod bearings 1
Connecting rods 2
Connecting rod caps 3
(onto crank pins)
Align the projection of bearing with the groove of
the caps and connecting rod.
Make sure to reinstall each connecting rod bear-
ing in its original place.
The stamped “Y” mark a on the connecting rods
should face towards the left of the crankshaft.
Be sure that the letter b on both components
align to form a perfect character.
3. Align:
Bolt head
(with connecting rod cap)
4. Tighten:
Connecting rod nuts
When you reach 3.5 Nm (3.5 m
kg), keep tight-
ening until the final torque is obtained. Apply
continuous torque until the specified torque is
obtained.
Summary of Contents for 4TX-AE1
Page 1: ......
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 20: ...SPEC 2 ...
Page 22: ...SPEC ...
Page 45: ...2 23 LUBRICATION DIAGRAMS SPEC 1 Cylinder head 2 Rear balancer 3 Crankshaft 4 Drain bolt ...
Page 46: ...2 24 LUBRICATION DIAGRAMS SPEC 1 Main axle 2 Drive axle ...
Page 56: ...SPEC ...
Page 57: ...INSP ADJ 3 ...
Page 121: ...INSP ADJ ...
Page 122: ...ENG 4 ...
Page 192: ...ENG ...
Page 193: ...COOL 5 ...
Page 195: ...COOL ...
Page 204: ...CARB 6 ...
Page 206: ...CARB ...
Page 214: ...CARB ...
Page 215: ...CHAS 7 ...
Page 273: ...CHAS ...
Page 274: ...ELEC 8 ...
Page 276: ...ELEC ...
Page 306: ...8 30 LIGHTING SYSTEM ELEC ...
Page 307: ...8 31 SIGNAL SYSTEM ELEC SIGNAL SYSTEM CIRCUIT DIAGRAM ...
Page 322: ...ELEC ...
Page 323: ...TRBL SHTG 9 ...
Page 325: ...TRBL SHTG ...