Product Guide
VESDA ECO Detector by Xtralis
84
Appendix C – Installation Check List
17898_05
Appendix C – Installation Check List
Site Name
:
Address
:
ECO Part Number
:
ECO Serial Number
:
ECO Site Location
:
Checklist
Yes No
Was the ECO detector intact in the box?
Is the sampling pipe firmly connected to the detector
ports?
Ensure the pipe is NOT glued to the detector.
Have the power wires been connected to the correct
terminals on the detector?
Has the termination resistor been selected if the
RS485 bus?
Have the alarm signaling wires been terminated to
the correct terminals of the detector?
Has the ECO cover been replaced correctly?
Is the air sampling pipe work installed and checked
as per the site requirements?
Is the gas sample port sealed?
Name of Installer
:
Signature
:
Date
: