2.0 INSTALLATION
24
© 2002 Xantrex Technology Inc.
P/N 975-0041-01-02 Rev A 03/02
Wiring (continued)
AC Wiring for Dual-Inverter Installations (continued)
Ground Wiring
1. Ensure there is a ground wire from inverter-1 to the main service panel.
2. Ensure there is a ground wire from inverter-2 to the main service panel.
3. Connect a wire from the ground bus in the main service panel to the
GROUND terminal in the GTI-1.
4. Connect a wire from the ground bus in the main service panel to the
GROUND terminal in the GTI-2.
5. Connect a wire from the ground bus in the main service panel to the
GROUND terminal in the sub-panel.
See Figure 2-8a for an illustration of the ground wiring for dual-inverter/
dual-GTI installations.
Summary of Contents for Trace SW4024
Page 1: ...Installation Guide Grid Tie Interface GTI SW Series SW4024 SW4048 SW5548...
Page 44: ...2 0 INSTALLATION 38 2002 Xantrex Technology Inc P N 975 0041 01 02 Rev A 03 02 Notes...
Page 46: ...3 0 TROUBLESHOOTING 2002 Xantrex Technology Inc P N 975 0041 01 01 Rev A 01 02 40 Notes...
Page 48: ...2002 Xantrex Technology Inc P N 975 0041 01 02 Rev A 03 02 A 2...
Page 53: ......
Page 54: ......
Page 55: ......