630140_1
XFIRE_1200_GB_Manual_R
‐
emotion
21.0 Annual Service Check:
The Fireplace should be serviced annually to ensure it continues to operate in a safe
manner. This annual service check should involve the following
•
Replace
thermocouple
•
Check glass assembly gasket
•
Clean pilot and main burner jets
•
Paint firebox [if required]
•
Inspect flue system [if possible]
•
General clean and inspection
22.0
Installation Check List:
1
Fuel bed correctly installed as per manual
2
Operating pressure checked with fire running on full (high flame setting)
and all other gas appliances in the house switched on.
3
Flue restrictor fitted if required, flame picture verified 15 minutes
after
start-up.
4
Ensure the pilot frame is clearly visible and free from loose
material (coals or gravel).
5
After Plaster Board installation, run fire on high for 60 minutes with house
doors and windows open to clear smell of paint and oils during initial burn.
6
Fire and flue clearances comply with these instructions.
7
Fire securely fixed to wall.
8
Leak test all joints and pressure test points. Soapy water and drop test
done on pipe work.
9
Remote Handset cradle screwed to wall.
10
House holder has been shown how to operate fire.
11
User instructions have been left out for house holder, installer has
filled in their own details and fire serial number into warranty card.
12
Inform the customer that the fire may continue smelling for a while after
installation
depending
on
frequency & duration of use