630140_1
XFIRE_1200_GB_Manual_R
‐
emotion
Note:
THERE ARE A FEW THINGS TO CONSIDER BEFORE INSTALLATION
• Cavity Dimensions and Clearances
•
MUST
be installed 100mm minimum off the floor or nearest horizontal surface.
• Coupling of flue to fire
• Coupling of gas lines to fire
• Fixing the fire to cavity
• Gas pipe placement to the front left of the cavity.
• Before installation, ensure that the local distribution conditions (identification of the type
of gas and pressure) and the adjustment of the appliance are compatible.
The sequence in which it is desired to undertake these tasks may vary upon the individual
installation that is required. Please read these instructions fully before proceeding with the
installation. Leave unpacking and installation of the stone frame (facia) until the fireplace
has been commissioned, to avoid damage to the facia panels.
Recommended Installation Process:
The following diagram illustrates the steps required to install your gas fire, and the trades
required at each stage.
Builder
1.
Construct
Frame
(Section
1.0
to
6.0)
Gasfitter
4.
Install
Flue
+
Flue
Restrictor
if
required
(Section
12.0
to
13.0)
5.
Test
fire
and
verify
flame
pattern
is
acceptable
6.
Cover
‐
up
fire
using
packaging
(Section
17.0)
Gasfitter
2.
Install
Gas
Pipe
(Section
7.0
to
8.0)
3.
Install
Fire
(Section
9.0
to
11.0)
Ensure
that
you
leave
a
gap
between
the
studwork
and
the
fire
chassis
to
accept
the
wall
lining
if
applicable.
Builder
7.
Clad
/
line
chimney
breast
Gasfitter
8.
Commission
the
Gas
Fire
(Section
18.0)