630140_1
XFIRE_1200_GB
_Service_R
‐
em
otion
Contents:
DIS
‐
ASSEMBLY
‐
Isolate
power
and
gas
supply
‐
1.0
‐
Remove
facia
‐
2.0
‐
Remove
glass
assembly
‐
3.0
‐
Remove
firebox
contents
‐
4.0
‐
Remove
Control
Tray
[if
required]
‐
5.0
SERVICE
‐
Check
glass
assembly
‐
6.0
‐
Clean
pilot
and
main
burner
jet
‐
7.0
‐
Clean
burn
er
th
ermo
couple
‐
8
.0
‐
Paint
firebox
[if
required]
‐
9.0
‐
Inspect
flue
system
[if
possible]
‐
10.0
‐
General
clean
and
inspection
‐
11.0
RE
‐
ASSEMBLY
‐
Re
‐
assemble
‐
12.0
‐
Re
‐
establish
gas
and
electrical
connections
‐
13.0
‐
Replace
facia
‐
14.0
TROUBLESHOOTING
‐
15.0