Original Operating Instructions
BATD0100-ES-1-480-1 (Outdoor)
Installation
O_BATD0100-ES-1-480-1_(Outdoor)_V2.2_US
Page
62
of
110
Requirements for the installation site:
•
Foundation and formwork must be built according to all applicable laws,
regulations and local standards.
•
Ensure that there is sufficient room for installation, mounting, operation
and repair.
•
Required ambient conditions must be fulfilled (Table 15).
•
Ensure that the minimum required distances for escape routes must be
followed according to applicable local regulations and standards.
•
The product must be positioned on a foundation that ensures sufficient
air circulation.
•
The moved volume air volume can be seen in Table 15.
•
The product must be properly positioned on the foundation.
Figure 20 shows the area of the cable entries. All dimensions are given in
millimeters.
Figure 20: Cable entry areas (bottom view)
Pos.
Description
1
Data communication, measuring, supply voltage
2
AC connection
3
Measuring, supply voltage
4
DC connection
Summary of Contents for BATD0100-ES-1-480-1
Page 110: ......