Original Operating Instructions
BATD0100-ES-1-480-1 (Outdoor)
Maintenance
O_BATD0100-ES-1-480-1_(Outdoor)_V2.2_US
Page
100
of
110
9.1 Maintenance every 12 Month
During each maintenance interval, the following tasks must be checked.
Table 11: Maintenance in de-energized condition (every 12 month)
Maintenance Tasks
See
Section 9.2.1
Visual Inspection of Interior Area
Section 9.2.2
Cleaning of Cooling Air Inlet and Cooling Air Outlet
Section 9.2.3
Torque Check of Electrical Connections
Section 9.2.4
Condition Check of Cables and Lines
Section 9.2.5
Section 9.2.6
9.2 Maintenance Tasks in De-energized Condition
Procedure:
1.
Perform
procedure according to Section 6.2.2.
2.
Disconnect
AC/DC voltage and supply voltage externally.
3.
Ensure
that the product is de-energized.
9.2.1 Visual Inspection of Housing
Maintenance Tasks:
1.
Check
the housing for visual defects e.g. corrosion, discoloration or
damages.
In case of visual defects,
repair
these immediately.
2.
Check
if any labels e.g. safety signs and type plates on the housing are
damaged or missing (Figure 9, Figure 10).
In case of damage or missing labels,
contact
customer service.
9.2.2 Visual Inspection of Interior Area
Maintenance Tasks:
1.
Check
the interior area for dust and water accumulation as well as any
vermin.
In case of dust accumulation, water accumulation and vermin,
remove
it from the interior area.
2.
Check
parts for discoloration or damage.
In case of discoloration or damage,
contact
customer service.
Summary of Contents for BATD0100-ES-1-480-1
Page 110: ......